In: Civil Engineering
Please provide a step-by-step solution, with "Given:", "Find:", and "Solution:" format, for the problem below. Please be sure to include any tables, values, and references required to arrive at the solution you provide so that the process may be repeated for other values.
Vertical Formwork Design
Given: Design formwork for a 6-ft-high wall. The concrete is to be placed at a rate of 2 ft/hr and will not be vibrated. Concrete temperature is expected to be 50˚F. Use standard weight concrete, Type 1 cement, 3 in slump, with no admixtures. The maximum allowable deflection of bending members is to be 1/360 of the span. Use ¾ in Class I plyform for the sheathing with face-grain across the supports. Use 2x6 Hem-Fir No. 2 for the rest of the lumber and double-wales. Assume all bending members to be supported on three or more spans. Ties available for use have an allowable load of 5000 lb. Show all work.
Find: Design the formwork for this slab.
Solution: Show all your work.