DataSpan, Inc., automated its plant at the start of the current
year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current
year and installed a flexible manufacturing system. The company is
also evaluating its suppliers and moving toward Lean Production.
Many adjustment problems have been encountered, including problems
relating to performance measurement. After much study, the company
has decided to use the performance measures below, and it has
gathered data relating to these measures for the first four months
of operations.
|
Month |
|
1 |
2 |
3 |
4 |
|
Throughput time (days) |
? |
? |
? |
? |
|
Delivery cycle time (days) |
? |
? |
? |
? |
|
Manufacturing cycle efficiency (MCE) |
? |
? |
? |
? |
|
Percentage of on-time deliveries |
82% |
77% |
74% |
71% |
|
Total sales (units) |
3830 |
3667 |
3479 |
3347 |
|
|
Management would like to know the company's throughput time,
manufacturing cycle efficiency, and delivery cycle time. The data
to compute these measures have been gathered and appear below:
|
|
Average per Month (in days) |
|
1 |
2 |
3 |
4 |
Move time per unit |
0.8 |
|
0.5 |
|
0.6 |
|
0.6 |
|
Process time per unit |
2.3 |
|
2.2 |
|
2.1 |
|
2.0 |
|
Wait time per order before start
of production |
24. |
|
26.3 |
|
29.0 |
|
31.4 |
|
Queue time per unit |
4.4 |
|
5.0 |
|
5.7 |
|
6.5 |
|
Inspection time per unit |
0.9 |
|
1.1 |
|
1.1 |
|
0.9 |
|
|
Requirement 1: |
(a) |
Compute the throughput time for each month. (Round your
answers to 1 decimal place.) |
|
1 |
2 |
3 |
4 |
Total throughput time |
_________ |
_________ |
_________ |
_________ |
|
(b) |
Compute the manufacturing cycle efficiency (MCE) for each month.
(Round your answers to 1 decimal place. Omit the "%" sign
in your response.)
|
|
1 |
2 |
3 |
4 |
Manufacturing cycle efficiency (MCE) |
_________% |
_________% |
_________% |
_________% |
|
(c) |
Compute the delivery cycle time for each month. (Round
your answers to 1 decimal place.) |
|
1 |
2 |
3 |
4 |
Total delivery cycle time |
_________ |
_________ |
_________ |
_________ |
|
Requirement 2: |
Refer to the move time, process time, and so forth,
given above for month 4. |
(a) |
Assume that in month 5 the move time, process time, and so
forth, are the same as in month 4, except that through the use of
Lean Production the company is able to completely eliminate the
queue time during production. Compute the new throughput time and
MCE. (Round your answers to 1 decimal place. Omit the "%"
sign in your response.)
|
Total throughput
time
_________ |
|
Manufacturing cycle efficiency (MCE) _________% |
|
(b) |
Assume in month 6 that the move time, process time, and so
forth, are again the same as in month 4, except that the company is
able to completely eliminate both the queue time during production
and the inspection time. Compute the new throughput time and MCE.
(Round your answers to 1 decimal place. Omit the "%" sign
in your response.)
|
Total throughput time
_________ |
|
Manufacturing cycle efficiency (MCE)
_________% |
|
requirement 3
3-a. (Month 5) Refer to the move time, process time, and so
forth, given for month 4. Assume that in month 5 the move time,
process time, and so forth, are the same as in month 4, except that
through the use of Lean Production the company is able to
completely eliminate the queue time during production. Compute the
new throughput time and MCE.
3-b. (Month 6) Refer to the move time, process time, and so
forth, given for month 4. Assume in month 6 that the move time,
process time, and so forth, are again the same as in month 4,
except that the company is able to completely eliminate both the
queue time during production and the inspection time. Compute the
new throughput time and MCE.
(Round your answers to 1 decimal place.)
Show less
|
|
|
Month 5 |
Month 6 |
Throughput time |
|
days |
|
days |
Manufacturing cycle efficiency (MCE) |
|
% |
|
% |
|