1. On one approach of an intersection with fixed time traffic signal, vehicles arrival rate is...

1. On one approach of an intersection with fixed time traffic signal, vehicles arrival rate is 600 vehicles per hour. The effective green time for this approach is 30 seconds, the saturation flow of this approach is 1800 vehicles per hour and the cycle time of the intersection is 80 seconds.

a. Evaluate the performance of the signal design i.e. will all vehicles clear during the green time?

b. Recommend the changes to the green time for this approach to achieve an optimum signal design i.e. If there is surplus green time, then state its value.

c. Due to a traffic incident, the original saturation flow is reduced by 20%. Will there be any delay under the new situation based on the original design? How many vehicles will experience the delay?

d. Under a new strategic transport plan to divert some vehicles to other areas, the saturation flow has been reduced to 1300 vehicles per hour by reconfiguring the layout of the intersection. Under this condition how may vehicles will be delayed in each cycle?

Solutions

Expert Solution


Related Solutions

DOT wants to install a traffic signal at a dangerous intersection on US-51. The traffic signal...
DOT wants to install a traffic signal at a dangerous intersection on US-51. The traffic signal will cost $450,000. Based on historical data, it will eliminate, on average, one fatal accident every 10 years, but will cause 5 additional minor accidents every year. The standard cost assigned to fatal accidents is $12,300,000 and the cost assigned to minor accidents is $160,000 each. At an interest rate of 4% per year, does the B/C ratio justify the cost of the signal?...
A traffic signal on the four-leg signalized intersection is designed based on the information below. Please...
A traffic signal on the four-leg signalized intersection is designed based on the information below. Please answer the following questions. The startup lost time per phase is 2.0 seconds, and the clearance lost time per phase is 1.5 seconds. The deceleration rate of the vehicles is 3.4 m/s2, and the average length of the vehicles is 6.0 m. The lane width of normal lane is 3.3 m, and the turn bay width is 2.8 m. Please ignore the median width...
Traffic counts and signal timing data were collected for the intersection of Sand Creek Road and...
Traffic counts and signal timing data were collected for the intersection of Sand Creek Road and Wolf Road. The intersection is signalized. The collected data show that, for a particular cycle, vehicles on the through lane of the SB of Sand Creek Road had the following arrival headway pattern (counted from the start of the red time of the cycle): – 2.5 seconds for the first 10 seconds – 2 seconds for the time period of 44 ‐ 50 seconds,...
A traffic light at a certain intersection is green 50% of the time,yellow 10% of the...
A traffic light at a certain intersection is green 50% of the time,yellow 10% of the time, and red 40% of the time. A car approaches this intersection once each day. We would like to know about the number of days that pass up to and including the first time the car encounters a red light. Assume that each day represents an independent trial. a) Define the random variable of interest, it support, and parameter values. b) What is the...
For an intersection with signal control, explain what’s included in the total lost time and the...
For an intersection with signal control, explain what’s included in the total lost time and the reasons.
Given Choosing between two proposed traffic safety project intersection of a high crash rate intersection. Two...
Given Choosing between two proposed traffic safety project intersection of a high crash rate intersection. Two solutions are proposed. Project A: build a 5.57 million dollars overpass to separate the two roadways. The estimated value of the crash avoided will be 513000 per year over the next 20 years. Project B: improve the geometry and signal timing at the intersection at a cost of 418000 dollars. The estimated value of the crash avoided will be 61800 dollars per year over...
Vehicles arrive at a signalized intersection at a uniform rate of 900 veh/hr. The saturation flow...
Vehicles arrive at a signalized intersection at a uniform rate of 900 veh/hr. The saturation flow rate for the intersection is 1200 veh/hr. However, a crash has reduced the saturation flow rate to only 300 veh/hr for a one-hour period. Assuming D/D/1 queuing, determine: a. How long will it take for the resulting queue to clear? (6 points) b. How much delay is experienced as compared to if the saturation flow rate had NOT been reduced? (6 points) c. What...
1. the following information is provided for an intersection that will have signalization. calculate the signal...
1. the following information is provided for an intersection that will have signalization. calculate the signal timing for a two phase system also show the phase diagram . peak hour volumes: SB/NB/WB/EB;360/300/444/482 vph PHP; SB/NB/WB/EB:0.92/0.88/0.90/0.82 saturation flow: SB/NB/WB/EB:1500/1500/1800/1800vph distribution of vehicles for turning movements South bond North bond West bond East bond TM T R L    T R L T R L    T R L    % of TM 90 4 6    88 7 5    84...
An approach to a signalized intersection has a saturation flow rate of 1800 veh/h. At the...
An approach to a signalized intersection has a saturation flow rate of 1800 veh/h. At the beginning of an effective red, there are 6 vehicles in queue and vehicles arrive at a rate of 900 veh/h. The signal has a 60-second cycle with 25 seconds of effective red. What is the total vehicle delay after one cycle?
Two vehicles are approaching an intersection. One is a 2300 kg pickup traveling at 13.0 m/s...
Two vehicles are approaching an intersection. One is a 2300 kg pickup traveling at 13.0 m/s from east to west (the ?x- direction), and the other is a 1300 kg sedan going from south to north (the +y?direction at 21.0 m/s ). Q1: Find the x -component of the net momentum of this system. Q2: Find the y-component of the net momentum of this system. Q3: What is the magnitude of the net momentum? Q4: What is the direction of...