In: Civil Engineering
The clay layer below is covered with a layer of fill as shown. Assume the fill is placed instantaneously.
3 m Fill gt=20 kN/m3 |
3 m Sand gd=15 kN/m3 |
5 m Sand gsat=20 kN/m3 |
8 m Clay gt=20 kN/m3 CR=0.2 RR=0.04 cv=1.5 m2/yr OCR=1, A=0.7 |
Sand |