7) Which of the following is an example of value-added work? A) Repairing a defective product...

7) Which of the following is an example of value-added work?
A) Repairing a defective product B) Unpacking boxes in a stock room C) Waiting for customers to order D) Taking orders from customers
 
8) Which of the following can NOT be used to determine the extent to which an operation is lean?
A) Overall equipment effectiveness B) Value-added percentage C) Inventory turns D) Labor content
 
9) A product test is designed in such a way that for a defective product to be undiscovered, all four inspections would have to fail to catch the defect. The probability of catching the defect in inspection I is 90%, in inspection 2 80%, in inspection 3, 70% and in inspection 4.90%. What is the probability of catching a defect? Show work for partial credit.
 
10) Which of the following information is NOT included in Gantt charts?
A) The expected completion time of the project B) The critical path C) The slack time D) The budget for the project
 
11) Which of the following is the Pareto principle?
A) The majority of problems can be explained by many symptoms. B) The majority of problems can be explained by a few root causes. C) The majority of problems can be explained by many root causes. D) The majority of problems can be explained by one root cause.
 
12) C&A uses an assembly line of 30 stations to make a product. The cycle time is 5 minutes per unit. Step 10 is the most error-prone operation. Inspection occurs at the last station. What will be the information turnaround time for a defect made at station 10 if there is no inventory between stations? Show work for partial credit

Solutions

Expert Solution

7)

Correct answer is D) Taking orders from customers

Taking orders from customers is a value-added work

8)

correct answer is D) Labor content

Labor content can NOT be used to determine the extent to which an operation is lea

9)

probability of catching a defect = 0.9*0.8*0.7*0.9 = 0.4536

10)

Correct answer is A) the expected completion time of the project

the expected completion time of the project is not shown in Gantt chart

11)

Correct answer is B) The majority of problems can be explained by a few root causes

Pareto chart says 80% of issues are created by 20% root causes

12)

There are 20 stations between station 10 and last station as cycle time is 5 minutes so information turnaround time = 20*5 = 100 minutes


Related Solutions

Which of the following is an example of a value-added cost to a manufactured product? A....
Which of the following is an example of a value-added cost to a manufactured product? A. the cost of storing inventory B. the cost of handling inventory C. the depreciation expense of robots that assemble the product D. changing the setup of production-line operations
Which of the following is a value-added activity?
Which of the following is a value-added activity?  a. Reordering parts b. Processing sales orders C. Rework d. Handling customer complaints
A box contains 10 items, of which 3 are defective and 7 are non-defective. Two items...
A box contains 10 items, of which 3 are defective and 7 are non-defective. Two items are randomly selected, one at a time, with replacement, and x is the number of defective items in the sample. To look up the probability of a defective item being drawn from the box, using a binomial probability table, what would be the values of n, x and p to look up?
Box A contains 7 items of which 2 are defective, and box B contains 6 items of which 1 is defective.
Box A contains 7 items of which 2 are defective, and box B contains 6 items of which 1 is defective. If an item is drawn at random from each box. Find the probability that both items are non- defective. 1/21 19/42 10/13 25/42
Process maps (or flow charts) can only built on the value-added work activities in the process neglecting the non-value added work activities. (TRUE/FALSE)
  Process maps (or flow charts) can only built on the value-added work activities in the process neglecting the non-value added work activities. (TRUE/FALSE) Suppose that the results for an exam are normally distributed with a mean of 87 and a standard deviation of 17. Approximately 76% percentages of examinees pass the exam by the grade of 75. (TRUE/FALSE) Scatter plot represents a point plotted on a two-dimensional coordinate system. (TRUE/FALSE) Process capability ratio indicates whether or not the chance...
7. The relationship between the book value of shareholders' equity and the firm's Market Value Added...
7. The relationship between the book value of shareholders' equity and the firm's Market Value Added (MVA) and Economic Value Added (EVA) Yesterday, Water and Power Co. released its 2015 annual report on the company’s website. While reading the report for her boss, Asha came across several terms about which she was unsure. She leaned around the wall of her cubicle and asked her colleague, Rafael, for help. ASHA: Rafael, do you have a second to help me with my...
If a consumer is injured by a defective product, which of the following types of claims may the consumer bring? (Select two)
If a consumer is injured by a defective product, which of the following types of claims may the consumer bring? (Select two) Strict Liability Malfeasance Misdemeanor Negligence  
what is the difference between a value-added activity and nonvalue-added activity? Describe at least one example...
what is the difference between a value-added activity and nonvalue-added activity? Describe at least one example of each category and include in your description why your example is value-added or nonvalue-added. Be sure to state the type of business the activity is related to (for example, restaurant, bookstore, auto dealer, etc.)
Which of the following is true of the best product mix and work sequence?
Suppose a bicycle manufacturer that uses heijunka has received 360 orders (180 units of model A, 90 units of model B, and 90 units of model C) during the first quarter of this year. Suppose the firm’s plant can work 4 weeks per month and 5 days per week, manufacturing 120 units per week. Because the plant can produce 120 units per week, the firm has decided to operate its plant during the first three weeks of April this year,...
A box has 11 parts of which 4 are defective and 7 acceptable. 2 parts are...
A box has 11 parts of which 4 are defective and 7 acceptable. 2 parts are chosen at random without replacement. Find the probability that: a) both parts are defective. b) both parts are acceptable. c) only one part is defective.