Question

In: Civil Engineering

A developer proposes to construct a new housing project. The relevant data are: Determine the present...

  1. A developer proposes to construct a new housing project. The relevant data are:

Determine the present and future peak discharge and total runoff from a 150-mm 24-h storm. If all flow in excess of the present flow must be stored, how much reservoir capacity is required? The average slope is 1 percent.

Factor

Present Value

Future Value

Area m2

3.88 x 106

3.88 x 106

CN

80

85

% impervious

-

50

% modified

-

65

Solutions

Expert Solution


Related Solutions

Pine Village City council proposes to construct new recreation fields. Construction will cost $350,000 and Annual...
Pine Village City council proposes to construct new recreation fields. Construction will cost $350,000 and Annual expenses are $80,000. The city council estimates that the valve of added youth leagues is about $125,000 annually. In year 6 another $90,000 will be needed to refurbish the fields. The city council agrees to transform the ownership of the field to a private company for $150,000 at the end of year 10. a. Draw the cash flow diagram. b. If the MARR for...
At your trucking firm, the head of operations proposes a 5-year project to buy a new...
At your trucking firm, the head of operations proposes a 5-year project to buy a new fleet of 20 Tesla electric trucks. The trucks will cost $180,000 each and are eligible for bonus depreciation. In 5 years they will have a salvage value of $80,000 each. The new fleet will save the firm $400,000 per year in fuel costs, but will cost an additional $40,000 per year in maintenance. If your tax rate is 18% and your discount rate is...
Pine Village council proposes to construct new recreation fields. Construction will cost $350,000 and annual O&M...
Pine Village council proposes to construct new recreation fields. Construction will cost $350,000 and annual O&M expenses are $80,000. The city council estimates that the value of added youth leagues is about $125,000 annually. In year 6 another $90,000 will be needed to refurnish the fields. the city council agrees to transform the ownership of the fields to a private company for $150,00 at the end of year 10. a. Draw the cash flow diagram. b. If the MARR for...
a. Construct a scatter plot of the data. Determine the order of the polynomial that is represented by this data.
  Consider the following data: x 1 4 5 7 8 12 11 14 19 20 y 1 54 125 324 512 5,530 5,331 5,740 7,058 7,945 Use Excel to resolve: a. Construct a scatter plot of the data. Determine the order of the polynomial that is represented by this data. b. Obtain an estimate of the model identified in part a. c. Conduct a test of hypothesis to determine if a third- order, as opposed to a first-order, polynomial...
Develop a spreadsheet to determine the net present value or present worth of the following project:...
Develop a spreadsheet to determine the net present value or present worth of the following project: Bonus Depreciation: 0% Investment: 140,000 Revenue/Savings: 25,000 Incremental Expense/Cost: 5,000 Salvage Value: 25,000 Project Life: 10 years MACRS Schedule: 7 years Tax Rate: 25% MARR: 12% Inflation: 3% Is this a good investment to make? Rework the problem with Bonus Depreciation of 50% and 100% Determine the internal rate of return for the project in the previous problem with all three levels of Bonus...
Construct a pie graph for the data in Exercise 18. Data from in Exercise 18 A questionnaire on housing arrangements showed this information obtained from 25
Construct a pie graph for the data in Exercise 18. Data from in Exercise 18A questionnaire on housing arrangements showed this information obtained from 25 respondents. Construct a frequency distribution for the data (H = house, A = apartment, M =mobile home, C = condominium).
Construct the following network(AOA) and determine the minimum total cost to complete the project if indirect...
Construct the following network(AOA) and determine the minimum total cost to complete the project if indirect cost is Rs.1500 per day. Activity NT CT NC CC 1-2 6 4 6000 7800 1-3 7 4 3000 4200 2-3 4 1 5000 9200 2-5 6 5 6000 7500 3-4 7 3 2000 6800 4-5 3 1 2000 4000 4-6 7 3 4000 5600 5-6 5 4 3000 4100
Determine the breakeven (based on net present worth) initial cost for a project with an interest...
Determine the breakeven (based on net present worth) initial cost for a project with an interest rate of 6% and a useful life of 14 years with the following data: Annual Cost (O&M): $7,500/ year with an annual increase of $800/ year Annual Revenue = $9,000/ year with an annual increase of $1,000/ year Salvage Value: $50,000
Use the data from problem 7 to determine if there is interaction present in this study?...
Use the data from problem 7 to determine if there is interaction present in this study? Cite specific statistics to support your claim. How does the answer to part a effect the results of the study Drying Time (min) Paint 20 25 30 1 74 73 78 64 61 85 50 44 92 --------------------------------------------------- 2 92 98 66 86 73 45 68 88 85
Salarian Company is considering two capital expenditures. Relevant data for the projects are as follows: Project...
Salarian Company is considering two capital expenditures. Relevant data for the projects are as follows: Project A B Initial investment $202,575 $251,438 Annual income $43,820 $43,660 Life of project 6 years 9 years Salvage value $0 $0 Salarian Company uses the straight-line method to depreciate its assets. (a) Calculate the internal rate of return for each project. (For calculation purposes, use 4 decimal places as displayed in the factor table provided, e.g. 1.2512. Round answers to 0 decimal places, e.g....