Question

In: Mechanical Engineering

As a Mechanical engineer, to prevent building collapse from happen, Based on Engineering statics what factor...

As a Mechanical engineer, to prevent building collapse from happen, Based on Engineering statics what factor should you take into account in designing the structure of the mall and if ever this incident(building collapse) happen how would you as an engineer react and solve this issue.

Solutions

Expert Solution

• Building components tend to fail depending on materials, designs, method of construction, environmental conditions and the use to which the building is put. Substandard materials and design errors are major causes of component failure.

Some of the main causes for building collapses are bad design, faulty construction, foundation failure, extraordinary loads, unexpected failure modes or a combination of causes. But collapses also occur due to natural disasters such as earthquakes, floods, hurricanes, cyclones and fires.

Common Design faults:

All structures are designed to support loads without deforming excessively. These loads include live load, which is the weight of people and objects, rain and wind, and the dead load of the building itself. Internal factors/human errors.

The internal factors for bad design don’t only mean errors of computation, but a failure to account for loads the structure will be expected to carry, erroneous theories, reliance on inaccurate data, ignorance of the effects of repeated or impulsive stresses, and improper choice of materials or misunderstanding of their properties. The structural engineer is responsible for these failures, which are created at the drawing board. Sometimes failures occur due to obvious negligence or gross human error.

The external factorsThese are often natural, such as extraordinary loads, heavy rain, earthquakes, hurricanes and a defective site, with very unusual ground conditions, like sinking holes or swampy land. A building that is intended to stand for some years should be able to meet all these challenges. This is incorporated into the design. Identification of the characteristics of particular site conditions by the engineers/consultants, through suitable geo technical studies, can help with site selection and site progress that reduce the risk of failure. Inadequate awareness.

In order to solve the building collapse issue, there are some principles must be followed which are as follows:

1) Strict Adherence to Quality Building Materials.

2) The RIGHT Human Resource.

3) The RIGHT Design Structure.

4) Proper Maintenance Culture.

5) Passing and Signing the National Building Code.


Related Solutions

What is the future of mechanical engineering in drone?
What is the future of mechanical engineering in drone?
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner...
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner intends to sell the building in 15 years. A gas fired furnace option has a design life of 5 years, an initial cost of $13,000, a replacement cost of $6,000 and annual operating costs of $3,500, but adds no value to the building when sold. A geothermal heat pump system has a design life of 10 years, an initial cost of $17,000, a replacement...
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner...
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner intends to sell the building in 15 years. A gas fired furnace option has a design life of 5 years, an initial cost of $11,000, a replacement cost of $6,000 and annual operating costs of $3,500, but adds no value to the building when sold. A geothermal heat pump system has a design life of 10 years, an initial cost of $17,000, a replacement...
Taking into account your engineering specialty,which is mechanical,think that could happen if you are taking data...
Taking into account your engineering specialty,which is mechanical,think that could happen if you are taking data to know how you can solve an engineering problem that presents itself and the data you took were not taken properly and do not represent The population you are analyzing.What could happen?
What role does statics play in industrial engineering? Give some examples and explain the role of...
What role does statics play in industrial engineering? Give some examples and explain the role of statics in the examples. Please describe in detail and clearly
What is engineering economy? How can it be useful to an engineer? Write an essay that...
What is engineering economy? How can it be useful to an engineer? Write an essay that persuades the reader to want to study engineering economy.
What is MCB (Miniature circuit breaker)? When a mechanical engineer need this safety device?
What is MCB (Miniature circuit breaker)? When a mechanical engineer need this safety device?
Find a recent engineering failure in the news and prepare a technical report of at least 250 words explaining how a mechanical engineer could have prevented the failure.
Find a recent engineering failure in the news and prepare a technical report of at least 250 words explaining how a mechanical engineer could have prevented the failure. Explain clearly how your proposed prevention is a design, manufacturing, analysis, and/or testing issue.    
What could happen if you are analyzing some data to solve an engineering problem, but the...
What could happen if you are analyzing some data to solve an engineering problem, but the data was not taken correctly and does not represent the population size?
Nicki​ Johnson, a sophomore mechanical engineering​ student, receives a call from an insurance​ agent, who believes...
Nicki​ Johnson, a sophomore mechanical engineering​ student, receives a call from an insurance​ agent, who believes that Nicki is an older woman ready to retire from teaching. He talks to her about several annuities that she could buy that would guarantee her an annual fixed income. The annuities are as follows in the popup​ window ANNUITY   INITIAL PAYMENT INTO ANNUITY (AT t = 0)   AMOUNT OF MONEY RECEIVED PER YEAR   DURATION OF ANNUITY (YEARS) A   60,000   9,000   15 B   50,000  ...