Design a geothermal source power generation system;
a) Describe the type of geothermal power plant (Total Flow / Flash / Binary) 
b) Describe the turbine isentropic efficiency
c) Show the entire cycle in the T-s diagram.
d) Calculate the power produced.

answer for expert: Not all , just one of theese three ( Total flow / flash or binary)

 

Solutions

Expert Solution


Related Solutions

A binary geothermal power plant uses geothermal water at 160°C as the heat source. The plant...
A binary geothermal power plant uses geothermal water at 160°C as the heat source. The plant operates on the simple Rankine cycle with isobutane as the working fluid. Heat is transferred to the cycle by a heat exchanger in which geothermal liquid water enters at 160°C at a rate of 555.9 kg/s and leaves at 90°C. Isobutane enters the turbine at 3.25 MPa and 147°C and leaves at 79.5°C and 410 kPa. Isobutane is condensed in an air-cooled condenser and...
Design a power generation system by choosing one of the options given below. 1. Geothermal sourced...
Design a power generation system by choosing one of the options given below. 1. Geothermal sourced power plant  Define the geothermal power plant type (Total Flow/Flash/binary)  Define turbine isentropic efficiency  Show all the processes on a T-s diagram  Calculate how much power can be generated 2. Wind Power system  Assume Rayleigh wind regime  Define wind turbine power capacity  Define rated power of the turbine  Define cut-in, cut out and rated wind speed...
The initial investment for a geothermal power plant is $60,000,000 and is to be paid in...
The initial investment for a geothermal power plant is $60,000,000 and is to be paid in two years (year 0 and year 1) equally. The electricity generated by the plant is expected to bring revenue of 10,000,000 per year increasing at a rate of 3% annually. The total annual expenses of the plant will be 1,500,000 increasing at a rate 4% annually. The company that owns the plant plans to borrow 50% of the capital expenditure at a rate 6%....
Explain the biggest challenge in maintaining a geothermal power plant.
Explain the biggest challenge in maintaining a geothermal power plant.
fill blanks: D) a geothermal power plant running on a binary power cycle uses ........... as...
fill blanks: D) a geothermal power plant running on a binary power cycle uses ........... as the working fluid. e) using biomass as a fossil fuel does nto contribute to global climate change because ................................. F) the three renewable froms of energy that each provide about 6% of the total energy consumed in the USA are ............... , .................. , and .............. G) when the atmospheric increases with altitude is called an .................
Wind power generation system design; a-) Adopt Rayleigh wind regime. b-) Specify the power factor of...
Wind power generation system design; a-) Adopt Rayleigh wind regime. b-) Specify the power factor of the wind turbine. c-) Find the start, stop and nominal speed of the wind turbine d-) Calculate the annual energy production of the system
Wind power generation system design; a-) Adopt Rayleigh wind regime. b-) Specify the power factor of...
Wind power generation system design; a-) Adopt Rayleigh wind regime. b-) Specify the power factor of the wind turbine. c-) Find the start, stop and nominal speed of the wind turbine d-) Calculate the annual energy production of the system
In a double flash geothermal power plant, the high-pressure separator is operating at 1 MPa and...
In a double flash geothermal power plant, the high-pressure separator is operating at 1 MPa and the adiabatic low-pressure separator is operating at 300 kPa. The steam quality entering the adiabatic high-pressure separator is 0.3. The mass flow of saturated liquid leaving the low-pressure separator is 15 kgs. The exit pressure of the steam turbine is 15 kPa and the turbine isentropic efficiency is 0.8. Calculate a. The mass flow at the turbine exit b. The mass flow rate entering...
1. Power generation by natural gas or other petroleum productfired steam power plant is the...
1. Power generation by natural gas or other petroleum product fired steam power plant is the most comment way of producing energy in most parts of the worlda. Sketch steam power plant and discuss the function of each unit Operation in the process(b. What are the major operational and safety challenges in steam power plants )c. Pumps are the most important fluid movers in process industries, discuss the various types of Pumps you find in steam power plant and their...
A power company operates three power generation plants. One is a wind plant, and the other...
A power company operates three power generation plants. One is a wind plant, and the other two consume a combination of Fuel 1 and Fuel 2, emitting carbon dioxide in the process. In addition, all three plants require maintenance. The amount of fuel consumed (in Mg), maintenance required (in person-hours), carbon dioxide (CO2) emitted (in Mg), and power generated (in MWh) per day of operation is as follows: Maintenance Fuel 1 Fuel 2 CO2 Power Plant Required Required Required Emitted...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT