Question

In: Statistics and Probability

A system consists of three machines and two repairmen. At most two machines can operate at...

A system consists of three machines and two repairmen. At most two machines can operate at any time. The amount of time that an operating machine works before breaking down is exponentially distributed with mean 5 hours. The amount of time that it takes a single repairman to x a machine is exponentially distributed with mean 4 hours. Only one repairman can work on a failed machine at any given time. Let X(t) be the number of machines in working order at time t.

a) Calculate the long-run probability distribution of X(t).

b) In the long run, what fraction of time are both repairmen busy?

c) If an operating machine produces 100 units of output per hour, what is the long run output per hour of the system?

Solutions

Expert Solution


Related Solutions

: A production system has three production machines. Machine A consists one component with constant failure...
: A production system has three production machines. Machine A consists one component with constant failure rate of 0.000512 failures per day. Machine B consists of two components; this machine works if one or more of its components work; each one of these components has constant failure rate of 0.000725 and 0.000618 failures per day respectively. The third production machine consists of two components; the production in this machine stops if any of these two components stop; and one of...
The distribution system for the Herman Company consists of three plants, two warehouses, and four customers....
The distribution system for the Herman Company consists of three plants, two warehouses, and four customers. Plant capacities and shipping costs per unit (in $) from each plant to each warehouse are as follows:                        Warehouse Plant           1                       2            Capacity 1                4                        7               450 2                8                         5              600 3                5                         6               380                             Customer Warehouse          1                        2                            3                             4 1                            6                       4                            8                             4 2                           3                         6                            7                             7 Demand                300                     300                         300                        400 Formulate the linear programming model to minimize the cost of shipping...
A manufacturer has three machines A, B, and C. Machines A and B can be operated...
A manufacturer has three machines A, B, and C. Machines A and B can be operated for at most 12 hours whereas machine C must be operated for at least 5 hours a day. These three machines produce only two items X and Y. Product X requires 1 hour from machine A, two hours from machine B and 1 hour from machine C. Product Y requires 2 hours from machine A, one hour from machine B and 1.25 hours from...
A factory has three machines capable of producing widgets. All three machines together can produce 191...
A factory has three machines capable of producing widgets. All three machines together can produce 191 widgets per hour. Machine A and machine B together can produce 129 widgets per hour, while machine A and machine C can together produce 137 widgets per hour. How many widgets per hour can each machine produce? A factory has three machines capable of producing widgets. All three machines together can produce 242 widgets per hour. Machine A and machine B together can produce...
Consider a small machine shop where each worker can operate all the machines but operates some...
Consider a small machine shop where each worker can operate all the machines but operates some of the machines better than others. On any given day there are a number of jobs which have to be completed. For this situation, the problem facing management, is how to obtain the fastest turnaround time for all jobs. The time it takes to perform an average job for each of these workers is as follows: Drilling Grinding Lathework Joe 5 10 6 Jack...
Metropole Inc. can produce three different products interchangeably on two machines. The accounting department provides the...
Metropole Inc. can produce three different products interchangeably on two machines. The accounting department provides the following information on these products: A B C Selling price per unit $24 $36 $46 Variable costs per unit $13 $28 $37 Units produced per machine hour 10 12.5 20 Minimum units produced 115 none 145 Maximum units produced 240 none 220 The total machine hours available are 105. Determine the number of machine hours per unit for each product. (Round answers to 2...
Metropole Inc. can produce three different products interchangeably on two machines. The accounting department provides the...
Metropole Inc. can produce three different products interchangeably on two machines. The accounting department provides the following information on these products: A B C Selling price per unit $23 $37 $43 Variable costs per unit $13 $29 $34 Units produced per machine hour 10 12.5 20 Minimum units produced 115 none 145 Maximum units produced 240 none 220 The total machine hours available are 105. Determine the number of machine hours per unit for each product. (Round answers to 2...
What does the economic system consists of Economic system consists of
What does the economic system consists of Economic system consists of
Exercise 7.30 a-c Metropole Inc. can produce three different products interchangeably on two machines. The accounting...
Exercise 7.30 a-c Metropole Inc. can produce three different products interchangeably on two machines. The accounting department provides the following information on these products: A B C Selling price per unit $23 $37 $45 Variable costs per unit $12 $29 $37 Units produced per machine hour 10 12.5 20 Minimum units produced 125 none 165 Maximum units produced 200 none 220 The total machine hours available are 105. Determine the number of machine hours per unit for each product. (Round...
2. Suppose you operate a copying service that has two copy machines. After some experience, you...
2. Suppose you operate a copying service that has two copy machines. After some experience, you find that hiring additional workers increases your copying capacity by 500 sheets per worker each day, up to the eighth worker. But, after you have eight workers on staff, hiring additional workers produces no additional pages copied. a. Graph the APL and the MPL. [Hint: what would the MPL of the ninth worker be? What would the APL be if nine workers were hired?]...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT