How are bolted connection made during the construction of a steel framed building?

How are bolted connection made during the construction of a steel framed building?

Solutions

Expert Solution

Bolted connections are of various types and patterns according to requirements like the type and style of members to be connected and load carrying capacity of the connection required a bolted connection is designed and made. And during construction they are provided as :

step 1 : Analysis of how many bolts are required at the joint.

step 2 : Material of the bolt should be of same stregnth as of member.

step 3 : Bolt holes are made in primary members which are to be connected.

step 4 : Calculating the torque : Engineered joints require the torque to be chosen to provide the correct tension preload. Applying the torque to fasteners is commonly achieved using a torque wrench. The required torque value for a particular fastener application may be quoted in the published standard document, defined by the manufacturer or calculated.

step 5 :Thread engagement :  It is the length or number of threads that are engaged between the screw and the female threads.

step 6 : Locking mechanism : It keep bolted joints from coming loose.


Related Solutions

A company made the following expenditures in connection with the construction of its new building: Architect’s...
A company made the following expenditures in connection with the construction of its new building: Architect’s fees for the new building $25,000 Cash paid for land and run-down building on the land 425,000 Removal of old building 17,500 Salvage from sale of old building materials 6,000 Construction survey to site the new building 3,500 Legal fees for title search 4,500 Excavation for basement construction 45,500 Machinery purchased for operations 250,000 Storage charges on machinery because building was not ready when...
Discuss in detail the causes of twisting moment due to eccentric loading in bolted connection (include...
Discuss in detail the causes of twisting moment due to eccentric loading in bolted connection (include sketch). Explain the various approach in the design of moment resistance connection. As a civil engineer conclude the best approach of design?
Interest during Construction Dexter Construction Corporation is building a student condominium complex; it started construction on...
Interest during Construction Dexter Construction Corporation is building a student condominium complex; it started construction on January 1, Year 1. Dexter borrowed $1 million specifically for the project by issuing a 10%, 5-year, $1 million note, which is payable on December 31 of Year 3. Dexter also had a 12%, 5-year, $3 million note payable and a 10%, 10-year, $1.8 million note payable outstanding all year. In Year 1, Dexter incurred costs as follows: Interest during Construction Dexter Construction Corporation...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two columns which are “X” m apart. The beam is acting as a support for one end of a pair of crane wheel (B). The distance b/w wheels are “Y” m. The crane is used to lift max. of Z tonnes of load which is having hook at the centre of crane. Draw shear force and B.M diagram of the beam. Case i) If the...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two columns which are “X” m apart. The beam is acting as a support for one end of a pair of crane wheel (B). The distance b/w wheels are “Y” m. The crane is used to lift max. of Z tonnes of load which is having hook at the centre of crane. Draw shear force and B.M of all types of beam diagram of the...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two...
A rectangular cross section beam (A) made of steel constructed in an industrial building between two columns which are “X” m apart. The beam is acting as a support for one end of a pair of crane wheel (B). The distance b/w wheels are “Y” m. The crane is used to lift max. of Z tonnes of load which is having hook at the centre of crane. Draw shear force and B.M diagram of the beam. Case i) If the...
2. Design an all-bolted double-angle connection for a W24x146 A992 beam to carry a dead load...
2. Design an all-bolted double-angle connection for a W24x146 A992 beam to carry a dead load reaction of 25 kips and a live load reaction of 75 kips. Use 5/16 in. angles and ¾ in A325N bolts in standard holes. The uncoped beam is connected to the flange of a W14x132 column. Design by both LRFD and ASD method.
XYZ Corp began construction on a building on January 1, 2016. On that date, it made...
XYZ Corp began construction on a building on January 1, 2016. On that date, it made its first $500,000 payment. An additional $600,000 were paid on 4/1/2016 and $300,000 was paid on 7/1/2016. A final payment of $100,000 was made on 12/31/2016, which is also the date when the construction project was finished and the building was ready to use. To finance the project, XYZ Corp issued a $800,000 10% note. Furthermore, XYZ Corp had a $2,000,000 5% note outstanding...
XYZ Corp began construction on a building on January 1, 2016. On that date, it made...
XYZ Corp began construction on a building on January 1, 2016. On that date, it made its first $500,000 payment. An additional $600,000 were paid on 4/1/2016 and $300,000 was paid on 7/1/2016. A final payment of $100,000 was made on 12/31/2016, which is also the date when the construction project was finished and the building was ready to use. To finance the project, XYZ Corp issued a $800,000 10% note. Furthermore, XYZ Corp had a $2,000,000 5% note outstanding...
MSK Construction Company contracted to construct a factory building for $525,000. Construction started during 2019 and...
MSK Construction Company contracted to construct a factory building for $525,000. Construction started during 2019 and was completed in 2020. Information relating to the contract follows: 2019 2020 Costs incurred during the year $ 290,000 $ 150,000 Estimated additional cost to complete 145,000 — Billings during the year 260,000 265,000 Cash collections during the year 240,000 285,000 Required: Record the preceding transactions in MSK’s books assuming it recognizes revenue over time and uses costs incurred to measure the extent to...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT