In: Mechanical Engineering
A noise source produces sound mainly at 2500 Hz and an SPL of 95 dB at the location of a worker. In order to decrease this worker’s noise exposure, the employer decides to build a brick wall (? = 400 kg/m2) between source and worker. What would the sound level at the worker’s location be after the wall is built. Assume that the wall is perfect and that the sound must go through it (not around it).