  1. The Ace Manufacturing Company has orders for three products. Each product can be produced on one of three different machines. The time (hours) for producing each product on each machine is given below:

Product

Machine                      A                    B                     C

                 1                             11                    12                    10

                 2                             12                    9                     11

                 3                             13                    15                    12       

Each machine can be assigned to only one product. Set up the objective function and the constraints necessary to minimize the total time.

Solutions

Expert Solution


Related Solutions

The Ace Manufacturing Company has orders for three similar products. Product Orders (units) AA 2,200 BB...
The Ace Manufacturing Company has orders for three similar products. Product Orders (units) AA 2,200 BB 700 CC 1,400 Three machines are available for the manufacturing operations. All three machines can produce all the products at the same production rate. However, due to varying defect percentages of each product on each machine, the unit costs of the products vary depending on the machine used. Machine capacities for the next week and the unit costs are shown below. Machine Capacity (units)...
Problem 6-09 (Algorithmic) The Ace Manufacturing Company has orders for three similar products: Product Order (Units)...
Problem 6-09 (Algorithmic) The Ace Manufacturing Company has orders for three similar products: Product Order (Units) A 2250 B 550 C 1100 Three machines are available for the manufacturing operations. All three machines can produce all the products at the same production rate. However, due to varying defect percentages of each product on each machine, the unit costs of the products vary depending on the machine used. Machine capacities for the next week and the unit costs are as follows:...
Problem 6-09 (Algorithmic) The Ace Manufacturing Company has orders for three similar products: Product Order (Units)...
Problem 6-09 (Algorithmic) The Ace Manufacturing Company has orders for three similar products: Product Order (Units) A 1950 B 400 C 1300 Three machines are available for the manufacturing operations. All three machines can produce all the products at the same production rate. However, due to varying defect percentages of each product on each machine, the unit costs of the products vary depending on the machine used. Machine capacities for the next week and the unit costs are as follows:...
Ace Household Products Inc. is a multi-product company with several manufacturing plants. The Shareport Plant manufactures...
Ace Household Products Inc. is a multi-product company with several manufacturing plants. The Shareport Plant manufactures and distributes two household cleaning and polishing compounds, standard and commercial, under the Clean & Bright label. The forecasted operating results for the first six months of the current year, when 100,000 cases of each compound are expected to be manufactured and sold, are presented in the following statement. CLEAN & BRIGHT COMPOUNDS - SHAREPORT PLANT Forecasted Results of Operations For the Six-Month Period...
Archi ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders from...
Archi ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders from a foreign company to manufacture plastic bags and disposable cups and which the company considers it as a positive sign for growth in the future. The company’s existing machinery will not be sufficient enough to produce for the present demand and to meet the foreign order. Two options are available (1) to lease a machinery or (2) buy a new machinery using bank loan....
1. Fahad Ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders...
1. Fahad Ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders from a foreign company to manufacture plastic bags and disposable cups and which the company considers it as a positive sign for growth in the future. The company’s existing machinery will not be sufficient enough to produce for the present demand and to meet the foreign order. Two options are available (1) to lease a machinery or (2) buy a new machinery using bank...
Abbas ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders from...
Abbas ltd. is a manufacturing company involved in manufacturing plastic products. It has received orders from a foreign company to manufacture plastic bags and disposable cups and which the company considers it as a positive sign for growth in the future. The company’s existing machinery will not be sufficient enough to produce for the present demand and to meet the foreign order. Two options are available (1) to lease a machinery or (2) buy a new machinery using bank loan....
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 1.50 3.00 2.00 B 2.00 1.00 2.50 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $25 for product 1, $28 for product 2,...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 3.00 2.00 1.50 B 1.00 2.50 2.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $28 for product 1, $30 for product 2,...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 3.00 2.00 1.50 B 1.00 2.50 2.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $28 for product 1, $30 for product 2,...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT