Question

In: Mechanical Engineering

In Francisco Automotive Manufacturing Plant, a large number of engineering activities are carried out in a wide range of areas.

 

Case Study

In Francisco Automotive Manufacturing Plant, a large number of engineering activities are carried out in a wide range of areas. These activities include design, production of parts, assembly, testing, and quality assurance.

Many of the manufacturing processes in the plant are performed using automated technologies and equipment. People also perform some of the manufacturing tasks and the plant employs over 400 workers. The decision on whether people or machines will be used for a particular task is dependent on many factors, including costs, time, quality and worker health and safety.

The plant considered here produces a many parts for vehicles and assembles them. Among the parts produced are engine materials and parts, pumps, fans, some exterior parts, and electronics components. The plant normally operates three shifts per day and has production lines including machining equipment, conveyers and overhead cranes, punch presses, and paint-spray booths. The plant utilizes electricity and natural gas extensively.

A number of workers at the plant have over the last six months been subject to several different health problems. The following information has been received by the head engineer at the plant.

a) In an assembly area that was installed recently, workers have to bend to the ground throughout the    day to attach several small parts onto a large and heavy vehicle component. Some workers have          begun to develop lower back pain, likely due to the repetitive bending. The problem has become so      severe for one of the workers that he has been told by his doctor to stay off work for two weeks so his     back can recover. The manufacturing engineers who designed the assembly operation had wanted to    use an automated system, but that option was deemed not to be economic. So they used a manual                   operation, but did not take into account industrial ergonomics, as they had no expertise in that               discipline.

b) An increased incidence of respiratory illnesses has been reported over the last month by workers       operating near the paint-spray booths. Many of the substances used in the booths (paints, solvents,            etc.) are known to be causes of the observed respiratory illnesses. But the workers are not supposed to come into contact with any of the substances because the paint-spray booths are designed to        ensure that all materials exit the plant through a high capacity ventilation system and that no materials can leak back into the plant. No tests had been carried out on the ventilation system, or on            the air quality around the paint spray booths, so it is uncertain whether or not there have been any                      leaks into the plant from the paint-spray booths.

c) In an area of the plant where metal cutting occurs and workers use protective eyewear, workers have reported minor eye injuries. The area in question is one where it is common knowledge that the workers do not routinely use the protective eyewear. It is often observed to be hanging on nearby hooks or to be loosely hanging around the necks of workers. Workers complain that they find the protective eyewear uncomfortable and do not think it is needed or important. The plant manager knows of this behaviour but overlooks it, since enforcing the use of the protective eyewear seems may make the workers unhappy and, consequently, less productive. That, he feels, could render the plant non-competitive.

Questions:

1) How would you go about investigating the causes of the observed health problems?

            2) What are the unsafe conditions and acts in the plant?

Solutions

Expert Solution


Related Solutions

In the Appliances Manufacturing Plant, a large number of engineering activities are carried out in a wide range of areas.
  CASE STUDY In the Appliances Manufacturing Plant, a large number of engineering activities are carried out in a wide range of areas. These activities include design, production of parts, assembly, testing, and quality assurance. Many of the manufacturing processes in the plant are performed using automated technologies and equipment. People also perform some of the manufacturing tasks and the plant employs over 400 workers. The decision on whether people or machines will be used for a particular task is...
Case Study In Francisco Automotive Manufacturing Plant, a large number of engineering activities are carried out...
Case Study In Francisco Automotive Manufacturing Plant, a large number of engineering activities are carried out in a wide range of areas. These activities include design, production of parts, assembly, testing, and quality assurance. Many of the manufacturing processes in the plant are performed using automated technologies and equipment. People also perform some of the manufacturing tasks and the plant employs over 400 workers. The decision on whether people or machines will be used for a particular task is dependent...
Section B Micky LLC is a company manufacturing and selling a wide range of automotive components...
Section B Micky LLC is a company manufacturing and selling a wide range of automotive components to the major vehicle assemblers. The company has experience rapid growth over the last 10 years and is profitable although cash flow is tight. The performance of each business units and employees are measured based on profitability and number of components sold. Performance measures makes comparisons between actual and budget performance using budgets. Kate the managing director of Micky LLC had attended a management...
EMT plc has a wide range of manufacturing activities, principally within the UK. The company operates...
EMT plc has a wide range of manufacturing activities, principally within the UK. The company operates on the divisionalized basis with each division being responsible for its own manufacturing, sales and marketing, and working capital management. Divisional chief executives are expected to achieve a target 20% return on sales. A disagreement has arisen between two divisions which operate on adjacent sites. The Office Products Division (OPD) has the opportunity to manufacture a printer using a new linear motor which has...
Plant-wide, department, and ABC indirect cost rates. Automotive Products (AP) designs and produces automotive parts. In...
Plant-wide, department, and ABC indirect cost rates. Automotive Products (AP) designs and produces automotive parts. In 2014, actual variable manufacturing overhead is $308,600. AP's simple costing system allocates variable manufacturing overhead to its three customers based on machine-hours and prices its contracts based on full costs. One of it customers has regularly complained of being charged noncompetitive prices, so AP's controller Devon Smith realizes that it is time to examine the consumption of overhead resources more closely. He knows that...
In the manufacturing process of automotive windshield glass, it is known that the average number of...
In the manufacturing process of automotive windshield glass, it is known that the average number of air bubbles found in a 1 [cm3] is 0.12. To detect the presence of bubbles in the crystal, samples of 10 [cm3] are analyzed. Assuming that the number of bubbles per cm3 follows a Poisson distribution and that this number is independent of one cm3 to another, it is requested a) Calculate the probability that a 10 cm3 sample does not contain air bubbles...
In the manufacturing process of automotive windshield glass, it is known that the average number of...
In the manufacturing process of automotive windshield glass, it is known that the average number of air bubbles found in a 1 [cm3] is 0.12. To detect the presence of bubbles in the crystal, samples of 10 [cm3] are analyzed. Assuming that the number of bubbles per cm3 follows a Poisson distribution and that this number is independent of one cm3 to another, it is requested a) Calculate the probability that a 10 cm3 sample does not contain air bubbles...
You are required to develop a petty cash system to ensure daily activities are carried out...
You are required to develop a petty cash system to ensure daily activities are carried out according to legislative requirements. i) Develop the policy ii) Develop a guideline for work procedures for: • carrying out a petty cash claim (for employees) and • advancing and accepting a petty cash claim (for the petty cash officer). The documents must be appropriately formatted and presented. Note: Providing any supporting forms is optional on this occasion.
Marta Enterprise is a large corporation that had business activities in such areas as building, maintenance...
Marta Enterprise is a large corporation that had business activities in such areas as building, maintenance services, real-estate investment, and truck leasing and auto parts distribution. The   following selected data was obtained from the company’s comparative income statements and statements of financial position. Income Statements Data For the Year ended 31/12/ YEAR 2 31/12/YEAR 1 Ksh. ‘000’ Kshs. ‘000’ Net sales 97,000 82,000 Cost of goods sold 57,500 47,500 Selling expenses 14,000 12,000 Administrative expenses 16,500 15,000 Interest expense on...
Marta Enterprise is a large corporation that had business activities in such areas as building, maintenance...
Marta Enterprise is a large corporation that had business activities in such areas as building, maintenance services, real-estate investment, and truck leasing and auto parts distribution. The   following selected data was obtained from the company’s comparative income statements and statements of financial position. Income Statements Data For the Year ended 31/12/ YEAR 2 31/12/YEAR 1 Ksh. ‘000’ Kshs. ‘000’ Net sales 97,000 82,000 Cost of goods sold 57,500 47,500 Selling expenses 14,000 12,000 Administrative expenses 16,500 15,000 Interest expense on...