Question

In: Statistics and Probability

Three distinct methods, A, B, and C, are available for teaching a certain industrial skill. The...

Three distinct methods, A, B, and C, are available for teaching a certain industrial skill.

The failure rates are 40%, 30%, and 20%, respectively.

However, due to costs, A is used twice as frequently as B, which is used twice as frequently as C.

(a) What is the overall failure rate in teaching the skill?

(b) A worker is taught the skill, but fails to learn it correctly. What is the probability he was taught by method A?

Solutions

Expert Solution


Related Solutions

Two method, A and B, are available for teaching a certain industrial skill. The failure rate...
Two method, A and B, are available for teaching a certain industrial skill. The failure rate is 20% for method A and 10% for method B. Method B is more expensive, however, and hence is used only 40% of the time. (Method A is used the other 60% of the time.) A worker is taught the skill by one of the two methods, but he fails to learn it correctly. What is the probability that he was taught by using...
Prove or disprove: If a, b, c are any three distinct positive integers such that 1/a...
Prove or disprove: If a, b, c are any three distinct positive integers such that 1/a + 1/b + 1/c = 1, then a + b + c is a prime
Prove or disprove: If a, b, c are any three distinct positive integers such that 1/a...
Prove or disprove: If a, b, c are any three distinct positive integers such that 1/a + 1/b + 1/c = 1, then a + b + c is a prime.
There are three treatment methods for a disease: A, B and C.  Effect A=20, Effect B=25, Effect...
There are three treatment methods for a disease: A, B and C.  Effect A=20, Effect B=25, Effect C=50; cost ($000's) A=$60,  cost ($000's) B=$75,  cost ($000's) C=$125; benefit ($000's) A=$64,  benefit ($000's) B=$60,  benefit ($000's) C=$200. a. Calculate Incremental cost-effectiveness ratio, cost benefit analysis and average cost-effectiveness ratio in $000's (show the formulas and calculations). b. Compare these three projects within the framework of economic evaluation.
Giant Company has three products, A, B, and C. The following information is available: Product A...
Giant Company has three products, A, B, and C. The following information is available: Product A Product B Product C Sales $70,000 $97,000 $23,000 Variable costs 37,000 51,000 15,000 Contribution margin 33,000 46,000 8,000 Fixed costs: Order and delivery costs 10,000 20,000 2,000 Allocated corporate costs 7,000 12,000 9,400 Operating income $16,000 $14,000 $ (3,400) Delivery and ordering costs are avoidable costs. a. Do you recommend discontinuing the Product C line? Why or why not? b. What additional factors should...
There are A, B and C, three plastic balls, A and B, B and C, C...
There are A, B and C, three plastic balls, A and B, B and C, C and A are attracted to each other, if A is positive: Group of answer choices 1. Both B and C are negatively charged. 2. One of the B balls and the C balls is going to be negatively charged and the other one is not charged 3. B ball, C ball has no charge 4. B ball is negatively charged, C ball is positively...
Inventory by three methods: The units of an item available for sale during the year are...
Inventory by three methods: The units of an item available for sale during the year are as follows: Jan 1.        Inventory             21 units at 1,800 May 15       Purchase            28 units at 1,950 August 7     Purchase            10 units at 2,040 Nov. 20        Purchase           17 units at 2,100 There are 20 units of the item in the physical inventory at December 31. ROUND YOUR INTERMEDIATE CALCULATIONS AND FINAL ANSWER TO THE NEAREST DOLLAR 1. Using First in First Out Method calculate cost...
There are three assets A, B and C. The returns for shares A, B and C...
There are three assets A, B and C. The returns for shares A, B and C over the next year have expected values 9%, 6%, 5% respectively. The standard deviations for A, B and C are 30%, 25% and 20% respectively. The covariance between these A and B is 0.0375, the covariance between A and C is -0.018, the covariance between B and C is -0.03. Ben currently has invested 40%, 40%, 20% in shares A, B and C respectively....
There are three assets A, B and C. The returns for shares A, B and C...
There are three assets A, B and C. The returns for shares A, B and C over the next year have expected values 10%, 5%, 3% respectively. The standard deviations for A, B and C are 30%, 25% and 20% respectively. The covariance between these A and B is 0.0375, the covariance between A and C is -0.018, the covariance between B and C is -0.03. Ben currently has invested equal amounts of his portfolio in shares A, B and...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST=10,740; SSTR=4,540 a. Set up...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT