Question

In: Accounting

Proocess Costing Instructions: Using the following data, complete the requirements given below. When you are given...

Proocess Costing

Instructions: Using the following data, complete the requirements given below. When you are given amounts to assume as the answers to previous requirements, be careful to use such assumed amounts rather than your answers (in order to minimize carry-through errors).

The Finishing Department of Curtis Corporation reports the following for January 2011:

Production: All materials are added at the beginning of the process. Beginning work in process 20,000 units, 60% complete. Units started into production 240,000 units. Ending work in process 10,000 units, 30% complete.

Manufacturing Costs: Beginning work in process, $40,000, comprised of $15,000 of materials and $25,000 of conversion costs. Materials added $160,000; labor and overhead added $465,000.

(a)    Required: Compute equivalent units of production for (1) materials and (2) conversion costs.

(b)    Assume your answers to (a) above were 250,000 units for materials and 245,000 for conversion costs.  Required: Compute the unit costs for the month.

(c)    Assume your answers to (b) above were $.90 for materials and $2.10 for conversion costs. Required: Determine the costs to be assigned to the 240,000 units transferred out.

(d)    Assume the same unit costs as given in (c) above.   Required: Determine the costs assigned to the 10,000 units in ending work in process.

Solutions

Expert Solution


Related Solutions

Instructions: Using the following data, complete the requirements given below. When you are given amounts to...
Instructions: Using the following data, complete the requirements given below. When you are given amounts to assume as the answers to previous requirements, be careful to use such assumed amounts rather than your answers (in order to minimize carry-through errors). The Finishing Department of Curtis Corporation reports the following for January 2011: Production: All materials are added at the beginning of the process. Beginning work in process 20,000 units, 60% complete. Units started into production 240,000 units. Ending work in...
Please complete the following code in C using the comments as instructions. Further instructions are below...
Please complete the following code in C using the comments as instructions. Further instructions are below the code. challenge.c // goal: print the environment variables to the file "env.txt", one per line // (If envp is NULL, the file should be empty, opening in write mode will do that.) // example: // inputs: // envp/environ = {"E1=2","E2=7",NULL} // outputs: // env.txt as a string would be "E1=2\nE2=7\n" // example: // inputs: // envp/environ = {NULL} or NULL // outputs: //...
Instructions: Complete the following problems using the format outlined in the homework requirements document. 1. Photons...
Instructions: Complete the following problems using the format outlined in the homework requirements document. 1. Photons are incident on an Aluminum plate and electrons are emitted as a result of the Photoelectric effect. Provide answers to the following questions: a. What threshold energy must the photon have to produce a photoelectron from Aluminum, which has a work function of 4.20 eV? b. Calculate the maximum energy of a photoelectron ejected from Aluminum by UV light with a wavelength of 1500...
Instructions: Using the data for the assignment complete your spreadsheet and answer the five questions. When...
Instructions: Using the data for the assignment complete your spreadsheet and answer the five questions. When you make the changes for question 4 and 5 your spreadsheet will change and your spreadsheet answer from the previous question may change depending on how you build your spreadsheet. That is OK, we can look at your spreadsheet and do some quick checks. Again, we are expecting to see formulas/functions in the spreadsheet. This assignment is similar to the Biz Café Individual Assignment...
Given the information below, complete the following requirements: A. Rank the customers by their gross margin...
Given the information below, complete the following requirements: A. Rank the customers by their gross margin as a percent of sales revenue. B. Perform customer profitability analysis by generating an operating income for each customer segment through the use of activity-based costing. C. Rank segments by their respective operating income as a percent of sales. D. If the relative rankings of the segments using operating income as a percent of sales is different from the relative rankings using gross margin...
Please follow the instructions carefully and complete the code given below. Language: Java Instructions from your...
Please follow the instructions carefully and complete the code given below. Language: Java Instructions from your teacher: (This is a version of an interview question I once saw.) In this problem, we will write a program that, given an integer k, an integer n, and a list of integers, outputs the number of pairs in in the list that add to k. To receive full credit for design, your algorithm must have a runtime in O(n) , where n is...
Complete the steps below using cell references to given data or previous calculations. In some cases,...
Complete the steps below using cell references to given data or previous calculations. In some cases, a simple cell reference is all you need. To copy/paste a formula across a row or down a column, an absolute cell reference or a mixed cell reference may be preferred. If a specific Excel function is to be used, the directions will specify the use of that function. Do not type in numerical data into a cell or function. Instead, make a reference...
Written Analysis Instructions As part your course requirements you are required to complete a Written Analysis...
Written Analysis Instructions As part your course requirements you are required to complete a Written Analysis of Data. The Analysis, 1 ½ to 2 pages in length (typed and double spaced), is worth 300 points. The maximum number of points you can obtain from the written assignment is 300. For this assignment you will be using be using both your creative writing and your analytical skills. Below you will find two sets of data set forth in two different tables....
Consider the following hypotheses and sample​ data, and then complete parts a and b below using...
Consider the following hypotheses and sample​ data, and then complete parts a and b below using alpha quals=0.10 H0​: μ≤16 H1​: μ>16 19 20 12 19 20 22 14 22 18 17         ​a) What conclusion should be​ drawn? Determine the critical​ value(s). The critical​ value(s) is(are) ______ ​(Round to three decimal places as needed. Use a comma to separate answers as​ needed.) Determine the test​ statistic, _____ ​(Round to two decimal places as​ needed.) What conclusion should be​ drawn?...
I need this answered not using excel Given the following data, construct a material requirements plan...
I need this answered not using excel Given the following data, construct a material requirements plan which will result in 100 units of parent #1 (P1), at the beginning of week 6 and 200 units of parent #2 (P2) at the beginning of week 8: item parent quantity on-hand on order(due) Lead Time Order size P1 - - - - 1 Lot-for-Lot P2 - - - - 1 Lot-for-Lot A P1, P2 1,2 70 0 1 500 B P1, P2...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT