Question

In: Statistics and Probability

Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract...

Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3,500 bookshelf speakers and 4,300 floor speakers over the next two months, with the following delivery schedule:

Model Month 1 Month 2
Bookshelf 2,200 1,300
Floor 1,600 2,700

Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour. The raw material costs are $11 for each bookshelf model and $13 for each floor model. Labor costs are $23 per hour using regular production time and $34 using overtime. Greenville has up to 2,500 hours of regular production time available each month and up to 1,100 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $6 per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. If required, round your answers to the nearest whole number. If an amount is zero, enter "0".

Regular Time Manufacture
Model Month 1 Month 2
Bookshelf ______ ______
Floor ______ ______
Overtime Manufacture
Model Month 1 Month 2
Bookshelf ______ ______
Floor ______ ______

Solutions

Expert Solution


Related Solutions

Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract...
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 4,100 bookshelf speakers and 4,900 floor speakers over the next two months, with the following delivery schedule: Model Month 1 Month 2 Bookshelf 2,500 1,600 Floor 1,900 3,000 Greenville estimates that the production time for each bookshelf model is 0.8 hour and the production time for each floor model is 1 hour. The raw material costs are $14 for...
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract...
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3300 bookshelf speakers and 4100 floor speakers over the next two months, with the following delivery schedule: Model Month 1 Month 2 Bookshelf 2100 1200 Floor 1500 2600 Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour. The raw material costs are $10 for...
A manufacturer of aluminium cabinets (built-in cabinets in vehicles) delivers 50 cabinets per day to a...
A manufacturer of aluminium cabinets (built-in cabinets in vehicles) delivers 50 cabinets per day to a customer. The fluctuation is 25 pieces per week. The customer demand must be 100% fulfilled. The processing time per cabinet is 20 minutes in machining (3-shift operation possible), 24 h for 55 cabinets in coating (incl. drying time) and 0.5 h in assembly incl. quality inspection. In assembly up to 4 workstations can work in parallel. After assembly there is a buffer of up...
Cabinets, Inc., is a large manufacturer of modular kitchen cabinets, sold primarily to builders and developers....
Cabinets, Inc., is a large manufacturer of modular kitchen cabinets, sold primarily to builders and developers. The company uses a standard cost system. Standard production costs have been developed for each type of cabinet; these costs and any cost variances are charged to the production department. A budget also has been developed for the sales department. The sales department is credited with the gross profit on sales (measured at standard cost) and is charged with selling expenses and any variations...
Scenario:  Cabinets, Inc., is a large manufacturer of modular kitchen cabinets, sold primarily to builders and developers....
Scenario:  Cabinets, Inc., is a large manufacturer of modular kitchen cabinets, sold primarily to builders and developers. The company uses a standard cost system. Standard production costs have been developed for each type of cabinet; these costs and any cost variances are charged to the production department. A budget also has been developed for the sales department. The sales department is credited with the gross profit on sales (measured at standard cost) and is charged with selling expenses and any variations...
Your company has placed a bit for a contract with a major air conditioning manufacturer, but...
Your company has placed a bit for a contract with a major air conditioning manufacturer, but the decision will not be made for four months. It cost the manufacturer $10,000 to prepare and submit the bid. The possible states of nature and their probabilities of occurring are as follows: (1) Receive the full contract (30%), (2) Receive a partial contract (20%), or (3) No contract (50%). ideally you would like to be up and running when the contract decision is...
Ch4A-7 Johnson Industries received a contract to develop and produce four high-intensity long-distance receiver/transmitters for cellular...
Ch4A-7 Johnson Industries received a contract to develop and produce four high-intensity long-distance receiver/transmitters for cellular telephones. The first took 2,000 labor hours and $39,000 worth of purchased and manufactured parts; the second took 1,500 labor hours and $37,050 in parts; the third took 1,450 labor hours and $31,000 in parts; and the fourth took 1,275 labor hours and $31,492 in parts. The company expects “learning” to occur relative to labor and also relative to the pricing of parts from...
Case 24.1 – It’s Not My Fault Scenario: Cabinets, Inc., is a large manufacturer of modular...
Case 24.1 – It’s Not My Fault Scenario: Cabinets, Inc., is a large manufacturer of modular kitchen cabinets, sold primarily to builders and developers. The company uses a standard cost system. Standard production costs have been developed for each type of cabinet; these costs and any cost variances are charged to the production department. A budget also has been developed for the sales department. The sales department is credited with the gross profit on sales (measured at standard cost) and...
Explain how an electric motor works. How does a stereo speaker use an electromagnet to produce...
Explain how an electric motor works. How does a stereo speaker use an electromagnet to produce sound? (10pts)
In looking at damages that can be received when a contract is not performed, there are...
In looking at damages that can be received when a contract is not performed, there are various types of penalties that might be imposed, with some involving monetary damages and others involving equitable remedies such as specific performance. In looking at the various types of damages, discuss the pros and cons of seeking an equitable remedy as opposed to monetary damages and do the pros outweigh the cons or would it have just been easier to seek monetary compensation? This...