In: Statistics and Probability
Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This addition will bring the number of machines to ten. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The arrival rate is 0.05 machines per hour for each machine, and the service rate for each individual assigned to the repair operation is 0.4 machines per hour.
P0 | =? | |
Lq | =? | |
L | =? | |
Wq | =? hours | |
W | =? hours |
P0 | =? | |
Lq | =? | |
L | =? | |
Wq | =? hours | |
W | = ? hours |
cost of 1 employee in the system = $ 30+80 =$110 per hour ans.
Cost of 2 employees in the system =$ 60+80 = $140 per 2 hour
From an economic point of view, 2 employees should handle the machine repair operation.