In: Statistics and Probability
To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data (in minutes) needed to mix the material:
Manufacturer 1 | Manufacturer 2 | Manufacturer 3 |
20 | 28 | 20 |
26 | 31 | 22 |
22 | 31 | 19 |
Identify the Response Variable in this ANOVA test. More than one of
the following choices may be correct. Select ALL correct
answers.
A. |
The Response Variable is the Batches of material that are being mixed up. |
||
B. |
The Response Variable is the Time required to mix a batch of material. |
||
C. |
The Response Variable is the specific Manufacturer of each machine. |
||
D. |
The Response Variable is the "Manufacturer". |