A
bi-level Entertainment center is under construction. Installation
of only 4 escalators is planned at the...
A
bi-level Entertainment center is under construction. Installation
of only 4 escalators is planned at the start although the ultimate
designs calls for 10. The question anses whether to provide
necessary facilities that would permit the installation of the
additional escalators (e.g. stair supports, wiring conduits, and
motor foundations) at the mere cost of their purchase and
installation now or to defer investment in these facilities until
the escalators need to be installed. The two options are detailed
as follows:
Option 1: Provide these facilities now for all six futures
escalators at $250,000
Option 2: Defer the investment as needed. Instalation of two
more escalators is planned in three years, two more in seven years,
and last two in ten years. The installation of these facilities at
the time they are required is estimated cost $220,000 in year 3,
$240,000 in year 7 and $260,000 in year 10.
For both options, additional annual expenses are estimated at
$500 for each escalator facility installed. Assume the company's
MARR is 15%
What the present worth of Option 1?
What the present worth of option 2?
Solutions
Expert Solution
As shown in calculation below net present value of cost in
option 1 is lower than that in option 2
4)
Long Beach, CA has a city center that is located on the
waterfront. If sea-level increases submerge a portion of the city
center, then we expect that
Select one:
a. there will be excess labor supply
b. household bids for residential land will shift upward
c. wages will increase
d. the residential territory will grow
5)
Suppose we have a monocentric city. If a zoning policy is
enacted that limits the height of buildings at the city center to...
Find the Federal Poverty level for a family of 4 with 2 children
under the age of 18.
Offer comments on why that statistic is shocking or why it is
incorrect.