Question

In: Statistics and Probability

When survey data indicated that a coffee company needed to improve its​ package-sealing process, an experiment...

When survey data indicated that a coffee company needed to improve its​ package-sealing process, an experiment was conducted to determine the factors in the​ bag-sealing equipment that might be affecting the ease of opening the bags without tearing the inner liner of the bag. Data were collected on 19 bags and the plate gap on the​ bag-sealing equipment was used to predict the tear rating of a bag. Complete parts​ (a) through ​(b).

Bag   Plate gap (X)   Tear rating (Y)
1   -0.3   0.06
2   -0.30   0.03
3   1.80   0.45
4   1.80   0.88
5   0.00   0.31
6   0.30   0.38
7   -0.30   0.77
8   0.00   1.96
9   -0.30   0.22
10   -1.80   0.19
11   -1.50   0.16
12   3.00   3.79
13   -1.80   0.05
14   0.00   0.57
15   -2.40   0.03
16   -1.80   0.12
17   1.50   0.41
18   1.80   4.02
19   0.00   0.09

a. Construct a 95​% confidence interval estimate of the mean tear rating for all bags of coffee when the plate gap is 0.3

b. Construct a 95​% prediction interval of the tear rating for an individual bag of coffee when the plate gap is 0.3

Solutions

Expert Solution

The statistical software output for this problem is :

(a)

A 95​% confidence interval estimate of the mean is :

(0.4663 , 1.3925)

(b)

A 95​% prediction interval is :

(-1.0955 , 2.9544)


Related Solutions

When survey data indicated that a company needed to improve its​ package-sealing process, an experiment was...
When survey data indicated that a company needed to improve its​ package-sealing process, an experiment was conducted to determine the factors in the​ bag-sealing equipment that might be affecting the ease of opening the bags without tearing the inner liner of the bag. Data were collected on 19 bags and the plate gap on the​ bag-sealing equipment was used to predict the tear rating of a bag. The results are displayed in the accompanying table and the regression equation is...
When survey data indicated that a company needed to improve its​ package-sealing process, an experiment was...
When survey data indicated that a company needed to improve its​ package-sealing process, an experiment was conducted to determine the factors in the​ bag-sealing equipment that might be affecting the ease of opening the bags without tearing the inner liner of the bag. Data were collected on 19 bags and the plate gap on the​ bag-sealing equipment was used to predict the tear rating of a bag. The results are displayed in the accompanying table and the regression equation is...
Problems of materials that coffee needed and environmental problems that affect the coffee making process
Problems of materials that coffee needed and environmental problems that affect the coffee making process
Design an experiment to determine a robust process for making coffee..
Design an experiment to determine a robust process for making coffee..
A student obtained the following data in this experiment. Fill in the blanks in the data and make the indicated calculations:
A student obtained the following data in this experiment. Fill in the blanks in the data and make the indicated calculations:Mass of gelatin capsule: 0.1 168 gMass of capsule plus alloy sample 0.2754 gMass of alloy sample, _______gTemperature, t 21 CTemperature, T ______KBarometric pressure 746 mm HgVapor pressure of H2O at t (CRC) ________mm HgPressure of dry H2, PH2 (Eq. 7) ________mm Hg________atmMass of empty beaker: 141.23 gMass of beaker plus displaced water: 307.75 gMass of displaced water : ________...
An experiment was performed to improve the yield of a chemical process. Four factors were selected,...
An experiment was performed to improve the yield of a chemical process. Four factors were selected, and two replicates of a completely randomized experiment were run. Based on the ANOVA table below, determine which factors are important in explaining yield. Use α = 0.05. A B C D AB AC AD BC BD CD ABC ABD ACD BCD ABCD
An experiment was performed to improve the yield of a chemical process. Four factors were selected,...
An experiment was performed to improve the yield of a chemical process. Four factors were selected, and two replicates of a completely randomized experiment were run. The results are shown in the following table: A B C D Yield 1 -1 -1 -1 -1 95 2 -1 -1 -1 -1 93 3 1 -1 -1 -1 74 4 1 -1 -1 -1 78 5 -1 1 -1 -1 81 6 -1 1 -1 -1 85 7 1 1 -1 -1...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into the Roasting Department. From the Roasting Department, coffee beans are then transferred to the Packing Department. The following is a partial work in process account of the Roasting Department at July 31: ACCOUNT Work in Process—Roasting Department ACCOUNT NO. Date Item Debit Credit Balance Debit Credit July 1 Bal., 5,400 units, 2/5 completed 10,476 31 Direct materials, 243,000 units 437,400 447,876 31 Direct labor...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into the Roasting Department. From the Roasting Department, coffee beans are then transferred to the Packing Department. The following is a partial work in process account of the Roasting Department at July 31: ACCOUNT Work in Process—Roasting Department ACCOUNT NO. Date Item Debit Credit Balance Debit Credit July 1 Bal., 5,400 units, 2/5 completed 13,392 31 Direct materials, 243,000 units 558,900 572,292 31 Direct labor...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into...
Hana Coffee Company roasts and packs coffee beans. The process begins by placing coffee beans into the Roasting Department. From the Roasting Department, coffee beans are then transferred to the Packing Department. The following is a partial work in process account of the Roasting Department at July 31: ACCOUNT Work in Process—Roasting Department ACCOUNT NO. Date Item Debit Credit Balance Debit Credit July 1 Bal., 4,900 units, 4/5 completed 6,958 31 Direct materials, 220,500 units 264,600 271,558 31 Direct labor...