In: Accounting
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.
Production Activity | Indirect Labor | Indirect Materials | Other Overhead | ||||||||
Grinding | $ | 390,000 | |||||||||
Polishing | $ | 125,000 | |||||||||
Product modification | 450,000 | ||||||||||
Providing power | $ | 240,000 | |||||||||
System calibration | 500,000 | ||||||||||
Additional information on the drivers for its production activities
follows.
Grinding | 17,000 | machine hours |
Polishing | 17,000 | machine hours |
Product modification | 1,300 | engineering hours |
Providing power | 20,000 | direct labor hours |
System calibration | 1,100 | batches |
Job 3175 | Job 4286 | |||
Number of units | 140 | units | 1,750 | units |
Machine hours | 500 | MH | 5,000 | MH |
Engineering hours | 33 | eng. hours | 24 | eng. hours |
Batches | 15 | batches | 45 | batches |
Direct labor hours | 410 | DLH | 3,690 | DLH |
Required:
1. Classify each activity as unit level, batch
level, product level, or facility level.
Required:
2, 3 & 4. Compute the activity overhead rates using
ABC. Combine the grinding and polishing activities into a single
cost pool. Determine overhead costs to assign to the above jobs
using ABC. What is the overhead cost per unit for Job 3175? What is
the overhead cost per unit for Job 4286? (Round your
activity rate and average overhead cost per unit to 2 decimal
places. Round "overhead assigned" to the nearest whole
dollar.)
5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.)