Benefit-Cost Analysis Given Parameters: Scenario One Benefit-Cost Ratio: 1.11 Scenario Two Benefit-Cost Ratio: 0.52 Did your...

Benefit-Cost Analysis

Given Parameters:

Scenario One Benefit-Cost Ratio: 1.11

Scenario Two Benefit-Cost Ratio: 0.52

  1. Did your benefit-cost analysis reach the same or different conclusions in the two scenarios analyzed? If different conclusions, why?
  2. Assume that the proposal in fact “passed” the analysis with a benefit-cost ratio greater than 1. Does this imply that the proposed project is the optimal or best use for the $8.55 million to be invested in resource conservation? Explain.
  3. In conducting benefit-cost analyses, do you think nonuse values should be considered? Why or why not?
  4. Current models of climate change and cost-benefit analysis can rely heavily on the inclusion of extremely low probability but very high cost (catastrophic and irrevocable ecosystem changes, for example) events. Do inclusion of these events increase the validity of the analysis or do they bias the results?

Solutions

Expert Solution

What Is a Benefit-Cost Ratio (BRC)?

A benefit-cost ratio (BCR) is a ratio used in a cost-benefit analysis to summarize the overall relationship between the relative costs and benefits of a proposed project. BCR can be expressed in monetary or qualitative terms. If a project has a BCR greater than 1.0, the project is expected to deliver a positive net present value to a firm and its investors.

KEY TAKEAWAYS

  • A benefit-cost ratio (BCR) is an indicator showing the relationship between the relative costs and benefits of a proposed project, expressed in monetary or qualitative terms.
  • If a project has a BCR greater than 1.0, the project is expected to deliver a positive net present value to a firm and its investors.
  • If a project's BCR is less than 1.0, the project's costs outweigh the benefits, and it should not be considered.

How Benefit-Cost Ratio Works

Benefit-cost ratios (BCRs) are most often used in capital budgeting to analyze the overall value for money of undertaking a new project. However, the cost-benefit analyses for large projects can be hard to get right, because there are so many assumptions and uncertainties that are hard to quantify. This is why there is usually a wide range of potential BCR outcomes.

The BCR also does not provide any sense of how much economic value will be created, and so the BCR is usually used to get a rough idea about the viability of a project and how much the internal rate of return (IRR) exceeds the discount rate, which is the company’s weighted-average cost of capital (WACC) – the opportunity cost of that capital.

The BCR is calculated by dividing the proposed total cash benefit of a project by the proposed total cash cost of the project. Prior to dividing the numbers, the net present value of the respective cash flows over the proposed lifetime of the project – taking into account the terminal values, including salvage/remediation costs – are calculated.

What Does the BCR Tell You?

If a project has a BCR that is greater than 1.0, the project is expected to deliver a positive net present value (NPV) and will have an internal rate of return (IRR) above the discount rate used in the DCF calculations. This suggests that the NPV of the project’s cash flows outweighs the NPV of the costs, and the project should be considered.

If the BCR is equal to 1.0, the ratio indicates that the NPV of expected profits equals the costs. If a project's BCR is less than 1.0, the project's costs outweigh the benefits, and it should not be considered.

Example of How to Use BCR

As an example, assume company ABC wishes to assess the profitability of a project that involves renovating an apartment building over the next year. The company decides to lease the equipment needed for the project for $50,000 rather than purchasing it. The inflation rate is 2%, and the renovations are expected to increase the company's annual profit by $100,000 for the next three years.

The NPV of the total cost of the lease does not need to be discounted, because the initial cost of $50,000 is paid up front. The NPV of the projected benefits is $288,388, or ($100,000 / (1 + 0.02)^1) + ($100,000 / (1 + 0.02)^2) + ($100,00 / (1 + 0.02)^3). Consequently, the BCR is 5.77, or $288,388 divided by $50,000.

In this example, our company has a BCR of 5.77, which indicates that the project's estimated benefits significantly outweigh its costs. Moreover, company ABC could expect $5.77 in benefits for each $1 of costs.

Limitations of BCR

The primary limitation of the BCR is that it reduces a project to a simple number when the success or failure of an investment or expansion relies on many factors and can be undermined by unforeseen events. Simply following a rule that above 1.0 means success and below 1.0 spells failure is misleading and can provide a false sense of comfort with a project. The BCR must be used as a tool in conjunction with other types of analysis to make a well-informed decision.

Compete Risk Free with $100,000 in Virtual Cash

Put your trading skills to the test with our FREE Stock Simulator. Compete with thousands of Investopedia traders and trade your way to the top! Submit trades in a virtual environment before you start risking your own money. Practice trading strategies so that when you're ready to enter the real market, you've had the practice you need. Try our Stock Simulator today >>

Related Terms

How to Use the Profitability Index (PI) Rule

The profitability index (PI) rule is a calculation of a venture's profit potential, used to decide whether or not to proceed.

moreProfitability Index

The profitability index (PI) is a technique used to measure a proposed project's costs and benefits by dividing the projected capital inflow by the investment.

moreInternal Rate of Return (IRR)

The internal rate of return (IRR) is a metric used in capital budgeting to estimate the return of potential investments.

moreNet Present Value (NPV)

Net Present Value (NPV) is the difference between the present value of cash inflows and the present value of cash outflows over a period of time.

moreDiscounted After-Tax Cash Flow Definition

The discounted after-tax cash flow method values an investment, starting with the amount of money generated.

moreDiscounted Cash Flow (DCF)

Discounted cash flow (DCF) is a valuation method used to estimate the attractiveness of an investment opportunity.


Related Solutions

between net present value rule used in cost benefit analysis and benefit-ratio used in cost-effectiveness analysis....
between net present value rule used in cost benefit analysis and benefit-ratio used in cost-effectiveness analysis. Why do most economists choose net present value rule? fix :“benefit ratio ” is “benefit-cost ratio”
• Do a cost-benefit analysis of the selected healthcare organization. Explain your analysis of the cost-benefit...
• Do a cost-benefit analysis of the selected healthcare organization. Explain your analysis of the cost-benefit ratio and how it helps an organization. • Explain the impact of the cost-benefit ratio on recruitment and retention strategies of a healthcare organization. • Outline ways to improve the cost-benefit ratio of the selected healthcare organization. • Explain the role of HRM in ensuring the most competitive compensation package for employees. • Describe methods of improving the compensation package of the selected healthcare...
What is cost-benefit analysis? How would you apply cost-benefit analysis to your decision to go to...
What is cost-benefit analysis? How would you apply cost-benefit analysis to your decision to go to college? What are the benefits and what are the costs of going to college? b. What happens to your analysis if the interest rate rises? What happens if the payoff period shrinks? Who is more likely to find college economically worthwhile: you for your 63-year-old professor? c. How would you apply cost-benefit analysis to environmental policy? What are the costs of pollution? What are...
There are two ways for finding the benefit to cost ratio (B/C Ratio) B/C Ratio =...
There are two ways for finding the benefit to cost ratio (B/C Ratio) B/C Ratio = [ Annual Benefits-Annual Disbenefits] / [Annual Cost of Implementing Project] B/C Ratio = [NPV of Benefits-NPV of Disbenefits] / [NPV of Implementing Project] If the B/C Ratio is greater than one, we can infer that the project is worth undertaking. Note that there can only be one B/C ratio for a project (unlike IRR which can at times have multiple values) Problem: The City...
5. Compare Present worth analysis, future worth analysis, annual worth analysis and benefit cost ratio analysis...
5. Compare Present worth analysis, future worth analysis, annual worth analysis and benefit cost ratio analysis of project evaluation.
Fiat Inc. has a target debt-equity ratio of 0.52. The cost of floating equity is 4.75...
Fiat Inc. has a target debt-equity ratio of 0.52. The cost of floating equity is 4.75 percent and the flotation cost of debt is 3.3 percent. The firm’s tax rate is 24 percent. What should the firm use as their weighted average flotation cost? A. 4.25% B. 4.05% C. 4.00% D. 3.50%
Discuss the challenges associated with the cost and benefit estimation methods in a cost-benefit analysis of...
Discuss the challenges associated with the cost and benefit estimation methods in a cost-benefit analysis of pollution abatement. 5 MARKS
Sixx AM Manufacturing has a target debt—equity ratio of 0.52. Its cost of equity is 16...
Sixx AM Manufacturing has a target debt—equity ratio of 0.52. Its cost of equity is 16 percent, and its cost of debt is 11 percent. If the tax rate is 34 percent, what is the company's WACC?
explain project cost-benefit analysis?
explain project cost-benefit analysis?
What does it mean to have a benefit-cost ratio greater than 1 (one)? A. It means...
What does it mean to have a benefit-cost ratio greater than 1 (one)? A. It means that the policy is too costly in comparison to the benefits B. It means that present value of benefits is greater than present value of costs C. It means that present value of costs is greater than present value of benefits D. It means that the policy is inefficient You have to recommend one alternative from two or more alternatives. If your recommendation has...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT