Month | Maintenance Hours | Maintenance Cost | ||||
June | 10 | $ | 3,950 | |||
July | 19 | 5,390 | ||||
August | 11 | 4,110 | ||||
September | 14 | 4,590 | ||||
October | 20 | 5,550 | ||||
November | 23 | 6,030 | ||||
December | 5 | 3,150 | ||||
Using the high-low method, estimate both the fixed and variable
components of its maintenance cost.
|
Months |
Units |
Cost |
|
High Level |
Nov |
23 |
$ 6,030.00 |
Low Level |
Dec |
5 |
$ 3,150.00 |
Difference |
18 |
$ 2,880.00 |
Total Cost at the high Point |
$ 6,030.00 |
|
Variable cost at the high Point: |
||
Volume at the high point |
23 |
|
Variable cost per hour/unit |
$ 160.00 |
|
Total Variable cost at the high point |
$ 3,680.00 |
|
Total Fixed Costs |
$ 2,350.00 |
|
Total cost at the low point |
$ 3,150.00 |
|
Variable cost at the Low Point: |
||
Volume at Low Point |
5 |
|
Variable cost per hour/unit |
$ 160.00 |
|
Total Variable cost at the low point |
$ 800.00 |
|
Total Fixed Costs |
$ 2,350.00 |