In: Accounting
The absolute maximum number of units that would be possible under the best conceivable operating conditions is a description of which type of manufacturing capacity? a. Practical b. Theoretical c. Currently attainable (expected) d. Normal The absolute maximum number of units that would be possible under the best conceivable operating conditions is a description of which type of manufacturing capacity? a. Practical b. Theoretical c. Currently attainable (expected) d. Normal The absolute maximum number of units that would be possible under the best conceivable operating conditions is a description of which type of manufacturing capacity?
Option B... Theoretical capacity
Capacity means the amount/units that can be produced.
Theoretical capacity is also called Ideal capacity .
Here, it is assumed that the maximum capacity production can be attained by performing the operations continuously at optimum efficiency.
It is not realistic due to repairs, maintenance, setups, and other factors that will result in down time.