Question

In: Statistics and Probability

One hundred insurance claim forms are inspected daily at Full Life Insurance Co. over 25 working days, and the number of forms with errors have been recorded in the worksheet Prob07-06 in the Ch07Data.xlsx file. Construct a p-chart

One hundred insurance claim forms are inspected daily at Full Life Insurance Co. over 25 working days, and the number of forms with errors have been recorded in the worksheet Prob07-06 in the Ch07Data.xlsx file. Construct a p-chart. If any points occur outside the control limits, assume that assignable causes have been determined and construct a revised chart.

Problem7-06
Full Life Insurance Co.


DayNumber Defective


13
23
33
42
50
63
70
81
97
103
112
120
130
144
151
162
174
180
191
201
210
222
238
241
25

4


Solutions

Expert Solution

There are two points occur outside the control limits. day 9 and 23.

Formula Ref:


Related Solutions

6.    One hundred insurance claim forms are inspected daily at Full Life Insurance Co. over 25...
6.    One hundred insurance claim forms are inspected daily at Full Life Insurance Co. over 25 working days, and the number of forms with errors have been recorded in the worksheet Prob07-06 in the Ch07Data.xlsx file. Construct a p-chart. If any points occur outside the control limits, assume that assignable causes have been determined and construct a revised chart. Problem7-06 Full Life Insurance Co. Day Number Defective 1 3 2 3 3 3 4 2 5 0 6 3 7...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT