Question

In: Economics

Go to Youtube and write 15 observations on Erie Canal Locks Time Lapse (5 minutes and...

Go to Youtube and write 15 observations on Erie Canal Locks Time Lapse (5 minutes and 16 seconds).

Solutions

Expert Solution

1. The Erie canal completed 200 Years on 4th of July 2017.
2. Over the years the canal enabled transportation of goods from Atlantic Ocean to Great Lakes.
3. It helped fuel the economy of the state of New York to a great extent since it was made operational. Even today 80% of population of New York State lives within 20 miles of the Erie Canal.
4. When it was made 200 years ago, it was twice the length of longest canals of Europe and a matter of immense national pride.

5. Elakanah Watson and Phillip Schuyler were the foremost advocates of building Erie Canal from Hudson River to Great Lakes. While Dewitt Clinton ( 10 times mayor of New York City ) was the foremost proponent of this Canal. So the canal was also called Dewitt’s folly or Clinton’s Ditch.

6. Construction of the canal started on 4th of July 1817 in Rome, New York with the use of tools such as shovels and horses.
7. The construction can be considered as the first practical big project of civil engineering in the USA and it saw many innovations during its construction.
8. Use of locks to hold water and increase water level for boats to ply on certain sections is one of the unique features of the canal. The most impressive of these locks system is in Lockport, Niagra county, New York where 5 locks are used and each of which lifts water level by 12 feet ( so total 60 feet)
9. The construction was completed and opened on October 26th , 1825 and was officially opened in a ceremony called “ Wedding of the Waters”. Governor Dewitt Clinton boarded a Vessel called Seneca chief and traveled from Buffalo, NY to NY city through the canal and Hudson river and deposited 2 buckets of fresh water of Erie into the Atlantic Ocean port of New York.
10.The canal was an instant success and made NY an economic powerhouse. It cut the journey short from 2 weeks in horse carriages to 5 days through Canal from Albany to Buffalo.
11. In 1835 due to heavy increase in traffic the canal width had to be doubled to 80 feet from 40 feet and depth to 7 feet from 4 feet.
12. Later since 1872 the importance of canal declined due to introduction of railways and steam power. Thus in 1895 new version of canal (which was larger and faster) was introduced to compete better with railroads called the Barge Canal, and was supported by Theodore Roosevelt, the then governor of New York.
13. Today the Erie Canal is not as important as it used to be but its legend lives on. The Erie canal song was written in 1905 and mentions about its low bridges and mule power being used to pull those barges.
14. The lock system in Erie Canal helps a barge to move towards higher elevation areas. The boat enters into a lock area which is then closed by locks, the water is filled in this enclosed area and thus the water level rises in the enclosed area and with it the boat rises. Now the boat can move into the higher elevation section of the canal.
15. Similarly while coming to lower elevations, the lock system works in opposite where by when a boat is in enclosed area the water is taken out from that enclosed area and water level thus falls and boat also goes down with it. Now the boat can move into the lower elevation section of the canal.


Related Solutions

Go to Youtube and write 15 observations on What is the Erie Canal? (History) 10 minutes...
Go to Youtube and write 15 observations on What is the Erie Canal? (History) 10 minutes and 1 second.
1) Go to Youtube and write 15 observations on these two videos (What is the Erie...
1) Go to Youtube and write 15 observations on these two videos (What is the Erie Canal? (History) 10 minutes and 1 second) and (Erie Canal Locks Time Lapse (5 minutes and 16 seconds).
Create 2 data sets. One with 5 observations and the other with 15 observations. Illustrate how...
Create 2 data sets. One with 5 observations and the other with 15 observations. Illustrate how variance is sensitive to an extreme score. Also show how sample size mediates the effect of an extreme score.
Time Remaining 5 minutes 19 seconds 00:05:19 Item 23 Item 23 Time Remaining 5 minutes 19...
Time Remaining 5 minutes 19 seconds 00:05:19 Item 23 Item 23 Time Remaining 5 minutes 19 seconds 00:05:19 On April 1st, Bob the Builder entered into a contract of one-month duration to build a barn for Nolan. Bob is guaranteed to receive a base fee of $5,800 for his services in addition to a bonus depending on when the project is completed. Nolan created incentives for Bob to finish the barn as soon as he can without jeopardizing the structural...
The following manufactured products have a nominal time of 80 minutes. Samples of five observations each...
The following manufactured products have a nominal time of 80 minutes. Samples of five observations each have been taken, and the results are as listed. Using two SPC techniques, determine the upper and lower control limits (using a 99% level of significance) and respond to the following questions: Present your control charts and briefly discuss your findings. Sample 1: 78 80 79 78 80 81 Sample 2: 77 78 79 79 75 81 Sample 3: 79 81 80 79 80...
Write a program that request a time interval in seconds and display it in hours, minutes,...
Write a program that request a time interval in seconds and display it in hours, minutes, second format. (java)
write minutes of a meeting using Microsoft Word Name of the organization  Date and time...
write minutes of a meeting using Microsoft Word Name of the organization  Date and time the meeting  Those present and those who could not attend  A list of the agenda items/topics  Summary of discussion for each agenda item  The actions people committed to  Summary of any decisions made
Write the definition for a generic / Template class called time that has hours and minutes...
Write the definition for a generic / Template class called time that has hours and minutes as structure. The class has the following member functions: SetTime to set the specified value in object ShowTime to display time object Sum to sum two time object & return time Write the definitions for each of the above member functions. Write main function to create three time objects. Set the value in two objects and call sum() to calculate sum and assign it...
The mean time between arrivals of customers in a bank is 3 minutes. Write the expression...
The mean time between arrivals of customers in a bank is 3 minutes. Write the expression for the exponential distribution for average time between arrivals for any time t (t>=0). If a customer has already arrived in the bank, what is the probability that the next customer will come after 10 minutes? What is the probability that 5 customers will arrive in the one hour interval? Answer with full steps. Thank you!, Any half answer or incomplete answer would be...
write minutes of a meeting using Microsoft Word Name of the organization  Date and time...
write minutes of a meeting using Microsoft Word Name of the organization  Date and time the meeting  Those present and those who could not attend  A list of the agenda items/topics  Summary of discussion for each agenda item  The actions people committed to  Summary of any decisions made
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT