In: Accounting
Funky frames makes frames. Every frame goes through 2 depts: assembly and finishing. The Beg. WIP is 100% done for DM and 40% done for CC. The Ending WIP is 100% done for DM and 30% done for CC. Funky frames uses the weighted average method.
Physical Units |
DM | CC | |
Beg. WIP |
95 | $1665 | $988 |
Ending WIP |
130 | ||
Completed | 455 | ||
Costs added this year |
$17,640 | $11,856 |
Compute WIP ending for the assembly dept.
Compute cost of completed units for the assembly dept.
What is the JE for transferring completed into the next dept.?