1. An order for 200 of a product is processed on operation A and operation B....

1.

An order for 200 of a product is processed on operation A and operation B. The setup time on A is 30 minutes, and the run time per piece is 5 minutes. The setup time on B is 50 minutes, and the run time is 3 minutes per piece. It takes 30 minutes to move a lot between A and B. Now, It is decided to overlap the two operations by splitting the lot of 200 into two lots of 120 and 80. When the first lot is finished on operation A, it is moved to operation B where it is set up and run. Meanwhile, operation A completes the second lot of 80 and sends the units over to operation B. These 80 units should arrive as operation B is completing the first lot of 120 (If not, the operation B has to wait till the lot 2’s arriving. Then operation B will have an idle time); thus, operation B can continue without interruption until all 200 units are completed. The total manufacturing hours spent are:

Select one:

a. 21.67

b. None of them

c. 25.34

d. 22.16

e. 22.55

2.

An order for 300 of a product is processed on operation A and operation B. The setup time on A is 50 minutes, and the run time per piece is 6 minutes. The setup time on B is 30 minutes, and the run time is 4 minutes per piece. It takes 30 minutes to move a lot between A and B. Now, It is decided to overlap the two operations by splitting the lot of 300 into two lots of 200 and 100. When the first lot is finished on operation A, it is moved to operation B where it is set up and run. Meanwhile, operation A completes the second lot of 100 and sends the units over to operation B. These 100 units should arrive as operation B is completing the first lot of 200 (If not, the operation B has to wait till the lot 2’s arriving. Then operation B will have an idle time); thus, operation B can continue without interruption until all 300 units are completed. The total manufacturing hours spent are:

Select one:

a. 36

b. None of them

c. 37.5

d. 38

e. 37

Solutions

Expert Solution

1.

An order for 200 of a product is processed on operation A and operation B. The setup time on A is 30 minutes, and the run time per piece is 5 minutes. The setup time on B is 50 minutes, and the run time is 3 minutes per piece. It takes 30 minutes to move a lot between A and B. Now, It is decided to overlap the two operations by splitting the lot of 200 into two lots of 120 and 80. When the first lot is finished on operation A, it is moved to operation B where it is set up and run. Meanwhile, operation A completes the second lot of 80 and sends the units over to operation B. These 80 units should arrive as operation B is completing the first lot of 120 (If not, the operation B has to wait till the lot 2’s arriving. Then operation B will have an idle time); thus, operation B can continue without interruption until all 200 units are completed. The total manufacturing hours spent are:

None of them

2.

An order for 300 of a product is processed on operation A and operation B. The setup time on A is 50 minutes, and the run time per piece is 6 minutes. The setup time on B is 30 minutes, and the run time is 4 minutes per piece. It takes 30 minutes to move a lot between A and B. Now, It is decided to overlap the two operations by splitting the lot of 300 into two lots of 200 and 100. When the first lot is finished on operation A, it is moved to operation B where it is set up and run. Meanwhile, operation A completes the second lot of 100 and sends the units over to operation B. These 100 units should arrive as operation B is completing the first lot of 200 (If not, the operation B has to wait till the lot 2’s arriving. Then operation B will have an idle time); thus, operation B can continue without interruption until all 300 units are completed. The total manufacturing hours spent are:

None of them


Related Solutions

Six jobs are to be processed through a two-step operation. The first operation involves sanding, and...
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as following table. Job Operation 1 (Hours) Operation 2 (Hours) A 10 5 B 7 4 C 5 7 D 3 8 E 2 6 F 4 3 Determine the sequence that will minimize the total completion time for the jobs using Johnson’s rule. Illustrate graphically the throughput time and idle time at the two operations by...
Six jobs are to be processed through a? two-step operation. The first operation involves? sanding, and...
Six jobs are to be processed through a? two-step operation. The first operation involves? sanding, and the second involves painting. Processing times are as? follows: Job Operation 1 (hours) Operation 2 (hours) A 4 8 B 10 5 C 3 11 D 14 14 E 6 1 F 7 12 A) Using? Johnson's rule for? 2-machine scheduling, the sequence? is: b) For the schedule developed using? Johnson's rule, the total length of time taken to complete the six jobs? (including...
A company manufactures Products A, B, and C. Each product is processed in three departments: I,...
A company manufactures Products A, B, and C. Each product is processed in three departments: I, II, and III. The total available labor-hours per week for Departments I, II, and III are 900, 1080, and 840, respectively. The time requirements (in hours per unit) and profit per unit for each product are as follows. (For example, to make 1 unit of product A requires 2 hours of work from Dept. I, 3 hours of work from Dept. II, and 2...
A company manufactures Products A, B, and C. Each product is processed in three departments: I,...
A company manufactures Products A, B, and C. Each product is processed in three departments: I, II, and III. The total available labor-hours per week for Departments I, II, and III are 900, 1080, and 840, respectively. The time requirements (in hours per unit) and profit per unit for each product are as follows. (For example, to make 1 unit of product A requires 2 hours of work from Dept. I, 3 hours of work from Dept. II, and 2...
A company manufactures Products A, B, and C. Each product is processed in three departments: I,...
A company manufactures Products A, B, and C. Each product is processed in three departments: I, II, and III. The total available labor-hours per week for Departments I, II, and III are 900, 1080, and 840, respectively. The time requirements (in hours per unit) and profit per unit for each product are as follows. (For example, to make 1 unit of product A requires 2 hours of work from Dept. I, 3 hours of work from Dept. II, and 2...
1. Under IFRS, a discontinued operation must be a: Select one: a. Product line. b. Cash...
1. Under IFRS, a discontinued operation must be a: Select one: a. Product line. b. Cash Generating Unit (CGU) c. Product line or Geographic segment. d. Geographic segment. 2. A company is preparing its bank reconciliation for December 31, 2004 (end of the reporting period). The following verified data are available: Based on the above data only, the amount for the December 2004 bank reconciliation Deposits in Transit is: Select one: a. Insufficient Information Provided b. 17810 c. 3070 d....
Summarize the steps a claim must go through in order to be processed and payment received.
Summarize the steps a claim must go through in order to be processed and payment received.
6.9. An order for 250 bell ringers is processed on work centers 10 and 20. The...
6.9. An order for 250 bell ringers is processed on work centers 10 and 20. The setup and run times are as follows. It is decided to overlap the lot on the two work centers and to split the lot into two lots of 100 and 150. Move time between operations is 30 minutes. Work center 20 cannot be set up until the first lot arrives. Calculate the saving in manufacturing lead time. Setup on A = 50 minutes Run...
Given this set of daily service operations, and assuming a processing order of A-B-C-D-E: Service Operation...
Given this set of daily service operations, and assuming a processing order of A-B-C-D-E: Service Operation Number of Daily Reps A 36 B 20 C 36 D 32 E 8 b. Determine the number of repetitions for each service if four cycles are used. Cycle 1 2 3 4 A B C D E c. Determine the number of repetitions for each service if two cycles are used. Cycle 1 2 A B C D E
—rRNA is processed by splicing A. True B. False —A mRNA that contains an ARE sequence...
—rRNA is processed by splicing A. True B. False —A mRNA that contains an ARE sequence it is more stable than a mRNA without an ARE sequence. A. True B. False — Which of the following describes group I introns? A. They are self-splicing. B. Splicing requires a free guanosine C. The 3D structure of the intron is important for intron function. D. Group 1 introns are small only 120-450 nt long E. All of the above describe group 1...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT