Question

In: Accounting

All that is missing is the cost amount for part 2. Thank you! Make-or-Buy, Traditional and...

All that is missing is the cost amount for part 2. Thank you!

Make-or-Buy, Traditional and ABC Analysis

Brees, Inc., a manufacturer of golf carts, has just received an offer from a supplier to provide 2,500 units of a component used in its main product. The component is a track assembly that is currently produced internally. The supplier has offered to sell the track assembly for $71 per unit. Brees is currently using a traditional, unit-based costing system that assigns overhead to jobs on the basis of direct labor hours. The estimated traditional full cost of producing the track assembly is as follows:

Direct materials $45.00
Direct labor 16.00
Variable overhead 5.00
Fixed overhead 40.00

Prior to making a decision, the company’s CEO commissioned a special study to see whether there would be any decrease in the fixed overhead costs. The results of the study revealed the following:

3 setups—$1,150 each (The setups would be avoided, and total spending could be reduced by $1,150 per setup.)

One half-time inspector is needed. The company already uses part-time inspectors hired through a temporary employment agency. The yearly cost of the part-time inspectors for the track assembly operation is $11,850 and could be totally avoided if the part were purchased.

Engineering work: 450 hours, $45/hour. (Although the work decreases by 450 hours, the engineer assigned to the track assembly line also spends time on other products, and there would be no reduction in his salary.)

75 fewer material moves at $30 per move.

Required:

1. Ignore the special study, and determine whether the track assembly should be produced internally or purchased from the supplier.
Produced internally

2. Now, using the special study data, repeat the analysis.

It is $ less  expensive to buy outside.

3. Which of the listed items is not a qualitative factor that would affect the decision?

The amount of cost savings that can be achieved

4. After reviewing the special study, the controller made the following remark: "This study ignores the additional activity demands that purchasing would cause. For example, although the demand for inspecting the part on the production floor decreases, we may need to inspect the incoming parts in the receiving area. Will we actually save any inspection costs?" Is the controller right?

Yes

Solutions

Expert Solution

Solution for Part 2:


Related Solutions

Make-or-Buy, Traditional Analysis Wehner Company is currently manufacturing Part ABS-43, producing 56,900 units annually. The part...
Make-or-Buy, Traditional Analysis Wehner Company is currently manufacturing Part ABS-43, producing 56,900 units annually. The part is used in the production of several products made by Wehner. The cost per unit for ABS-43 is as follows: Direct materials $47.35 Direct labor 10.50 Variable overhead 2.55 Fixed overhead 3.45   Total $63.85 Of the total fixed overhead assigned to ABS-43, $12,404 is direct fixed overhead (the annual lease cost of machinery used to manufacture Part ABS-43), and the remainder is common fixed...
Make-or-Buy, Traditional Analysis Wehner Company is currently manufacturing Part ABS-43, producing 53,200 units annually. The part...
Make-or-Buy, Traditional Analysis Wehner Company is currently manufacturing Part ABS-43, producing 53,200 units annually. The part is used in the production of several products made by Wehner. The cost per unit for ABS-43 is as follows: Direct materials $45.25 Direct labor 8.55 Variable overhead 2.15 Fixed overhead 4.00   Total $59.95 Of the total fixed overhead assigned to ABS-43, $15,800 is direct fixed overhead (the annual lease cost of machinery used to manufacture Part ABS-43), and the remainder is common fixed...
18. In make-or-buy decisions for a part for a product, relevant costs include ________. A) all...
18. In make-or-buy decisions for a part for a product, relevant costs include ________. A) all variable costs of making the part B) some variable costs of making the part C) fixed costs that can be avoided in the future if the part is purchased D) A and C 21.  Department A covers one section of a large factory building. Which of the following costs is relevant to the decision to eliminate Department A? A) Heating expenses of building allocated to...
Indicate the missing amount of different cost items, and prepare a condensed cost of goods manufactured...
Indicate the missing amount of different cost items, and prepare a condensed cost of goods manufactured schedule, an income statement, and a partial balance sheet. Incomplete manufacturing costs, expenses, and selling data for two different cases are as follows: Case   1 2 Direct Materials Used $ 6,300 $   (g) Direct Labour $3,000 $4,000 Manufacturing Overhead $6,000 $5,000 Total Manufacturing Costs (a) $ 16,000 Beginning Work in Process Inventory $1,000 (h) Ending Work in Process Inventory (b) $ 2,000 Sales $22,500...
Please show all work. Thank you! The amount of money requested on home loan applications at...
Please show all work. Thank you! The amount of money requested on home loan applications at America Bank follows normal distribution, with a mean of $180,000 and a standard deviation of $6,000. A loan application is received this morning. a) What is the probability the amount requested is $190,000 or more? b) What is the probability the amount requested is between $178,000 and $190,000? c) What is the probability the amount requested in below $178,000? d) How much is requested...
You can use 2 methods to make a certain part. Method 1 has an initial cost...
You can use 2 methods to make a certain part. Method 1 has an initial cost of $ 20,000 and a residual value of $ 5,000 after 3; years, that is, its lifespan. Annual operating costs amount to $ 8,500 / year. Method 2 initially costs $ 15,000 and has a lifespan of 2 years. Its residual value is $ 3,000 and the annual operating costs are $ 7,000 / year. Using a 2-year planning horizon and the residual value...
This is all one question Part 1 Suppose you want to buy a stock in a...
This is all one question Part 1 Suppose you want to buy a stock in a firm called “Infinity” the firm states that they expect to pay you $1 per year forever. What is a fair price for this stock if an investment in similar firms return 5% per year? (The computation is based on time value of money computations we learned in Chapter 5. Hint: Is this a perpetuity, if so how would you value it (what is the...
In this make or buy problem, you should compute the total cost of making a particular...
In this make or buy problem, you should compute the total cost of making a particular part and the total costs of buying the same part. Try following the solutions steps: Determine the parameters of the make cost function - the variable costs per unit and the fixed costs. Determine the fixed costs that are avoidable and the fixed costs that are unavoidable. Determine the buy price. Determine the alternative use of the idle resources under the buy, Note that...
In this make or buy problem, you should compute the total cost of making a particular...
In this make or buy problem, you should compute the total cost of making a particular part and the total costs of buying the same part. Try following the solutions steps: Determine the parameters of the make cost function - the variable costs per unit and the fixed costs. Determine the fixed costs that are avoidable and the fixed costs that are unavoidable. Determine the buy price. Determine the alternative use of the idle resources under the buy, Note that...
6. Use the periodic chart to fill in all the missing items so as to make...
6. Use the periodic chart to fill in all the missing items so as to make the nuclear decays complete. I.e., specify completely (i.e. including subscripts and superscripts) Z and X in each of the two separate reactions below. 92^238U + 0^1 n --> 57^140La + Z + 2 0^1n 88^226Ra --> X + 2^4 He
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT