In: Math
Formulate a system of equations for the situation below and
solve.
A manufacturer of women's blouses makes three types of blouses:
sleeveless, short-sleeve, and long-sleeve. The time (in minutes)
required by each department to produce a dozen blouses of each type
is shown in the following table.
Sleeveless |
Short- Sleeve |
Long- Sleeve |
|
---|---|---|---|
Cutting | 9 | 12 | 15 |
Sewing | 22 | 24 | 28 |
Packaging | 6 | 8 | 8 |
The cutting, sewing, and packaging departments have available a maximum of 73.5, 150, and 44 labor-hours, respectively, per day. How many dozens of each type of blouse can be produced each day if the plant is operated at full capacity?
sleeveless | dozen |
short-sleeve | dozen |
long-sleeve | dozen |