Question

In: Statistics and Probability

A manufacturing company is interested in predicting the number of defects that will be produced each...

A manufacturing company is interested in predicting the number of defects that will be produced each hour on the assembly line. The managers believe that there is a relationship between the defect rate and the production rate per hour. The managers believe that they can use production rate to predict the number of defects. The following data were collected for 10 randomly selected hours.

Defects (Y)

Production rate per hour(X)

2

40

3

45

1

35

2

37

3

40

2

40

3

45

2

30

1

30

4

30

  1. Construct a scatter plot diagram and comment on the relationship between y and x

  2. Calculate the correlation coefficient (r) between x and y and comment on the result.

  3. Find the coefficient of determination r2 and interpret the result.

Solutions

Expert Solution


a)

It looks like there is very weak linear relationshipt between y and x


Very weak positive relationship between x and y since value of r is very close to 0 and is positive
c) Coefficient of Determination(R-squared):
It gives the measure of how close the data points are to the best fit line. In other words, it gives the proportion of variability in dependent variable that can be explained by the independent variable. Higher the Rsquared value, better the model is.

Only 0.073 variablity in dependent variable that can be explained by the independent variable
Please hit thumbs up if the answer helped you


Related Solutions

A manufacturing company is interested in predicting the number of defects that will be produced each...
A manufacturing company is interested in predicting the number of defects that will be produced each hour on the assembly line. The managers believe that there is a relationship between the defect rate and the production rate per hour. The managers believe that they can use production rate (X) to predict the number of defects (Y). The following data were collected for 4 randomly selected hours. Defects (Y) Production Rate Per Hour (X) 20 400 30 450 10 350 20...
1.  A manufacturing company is interested in predicting the number of defects that will be produced each...
1.  A manufacturing company is interested in predicting the number of defects that will be produced each hour on the assembly line.  The managers believe that there is a relationship between the defect rate and the production rate per hour.  The managers believe that they can use production rate to predict the number of defects.   The following data were collected for 7 randomly selected hours. Defects             Production rate/h 2                      40 3                      45 1                      20 3                      40 5                      50 4                      30 6                      50 Set up a scatter diagram, and discuss what if any...
1.  A manufacturing company is interested in predicting the number of defects that will be produced each...
1.  A manufacturing company is interested in predicting the number of defects that will be produced each hour on the assembly line.  The managers believe that there is a relationship between the defect rate and the production rate per hour.  The managers believe that they can use production rate to predict the number of defects.   The following data were collected for 7 randomly selected hours. Defects             Production rate/h 2                      40 3                      45 1                      20 3                      40 5                      50 4                      30 6                      50 Set up a scatter diagram, and discuss what if any...
The data in the worksheet provides the number of defects produced in a series of panels....
The data in the worksheet provides the number of defects produced in a series of panels. a. Construct a C-chart for this process. b. Does the process appear to be in control? Why or why not? Panel Defects / Panel 1 2 2 12 3 9 4 13 5 8 6 10 7 11 8 7 9 9 10 10 11 6 12 9 13 13 14 12 15 15 16 4 17 9 18 10 19 5 20 6...
The data listed below provides the number of defects produced in a series of panels. a....
The data listed below provides the number of defects produced in a series of panels. a. Construct a C-chart for this process. b. Does the process appear to be in control? Why or why not? Panel Defects / Panel 1 2 2 12 3 9 4 13 5 8 6 10 7 11 8 7 9 9 10 10 11 6 12 9 13 13 14 12 15 15 16 4 17 9 18 10 19 5 20 6 21...
1. T F The number of defects on a product produced by a process is distributed...
1. T F The number of defects on a product produced by a process is distributed as a Poisson distribution. 2. T F For large binomially distributed populations and small samples you can use sampling without replacement 3. T F Given a triangular distribution with minimum 2, maximum 8 and mode 7, the probability of being smaller than 7 is greater than 60% 4. T F The hypergeometric distribution describes sampling without replacement 5. T F The relative frequency of...
Zero Defects & On-target: There are two manufacturing philosophies of manufacturing. Zero-defects is primarily practiced by...
Zero Defects & On-target: There are two manufacturing philosophies of manufacturing. Zero-defects is primarily practiced by American manufacturers and on-target is generally adopted by Japanese companies. Taking an example for an assembly, show how you will choose the target dimensions if you want to be close to the ideal by one SD, two SDs, and three SDs for both manufacturing philosophies. You may assume any adequate SD dimension. Example: Say the dimension and tolerance given to you is 100 mm...
11. A manufacturing company produced the following number of units in the last 16 days: 27...
11. A manufacturing company produced the following number of units in the last 16 days: 27 28 27 28 27 25 25 28 26 28 26 28 31 30 27 26 (e) How many classes would you recommend? Explain. (f) What class interval do you suggest? Explain. (g) What lower limit would you recommend for the first class? Explain. (h) Organize the information into a frequency distribution and determine the relative frequency distribution. You can do this either by hand...
develop simple linear regression models for predicting sales as a function of the number of each...
develop simple linear regression models for predicting sales as a function of the number of each type of ad. Compare these results to a multiple linear regression model using both independent variables. State each model and explain R- square, significance F and P-values. Concert Sales Thousands of Thousands of Sales ($1000) Radio&TV ads Newspaper ads $1,119.00 0 40 $973.00 0 40 $875.00 25 25 $625.00 25 25 $910.00 30 30 $971.00 30 30 $931.00 35 35 $1,177.00 35 35 $882.00...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 7 ounces. a. The process standard deviation is 0.10, and the process control is set at plus or minus 2 standard deviation s . Units with weights less than 6.8 or greater than 7.2 ounces will be classified as defects. What is the probability of a defect (to...