Fleming, Fleming, and Johnson, a local CPA firm, provided the following data for individual returns processed for March (output is measured in number of returns):

Units, beginning work in process
Units started 6,500
Units completed 4,600
Units, ending work in process (50% complete) 1,900
Total production costs $5,000

Required:

1. Prepare a physical flow schedule. If an amount is zero, enter "0".

Fleming, Fleming, and Johnson
Physical Flow Schedule
Units to account for:
Units in BWIP
Total units to account for
Units accounted for:
Units completed:
Total units accounted for

2. Prepare an equivalent units schedule.

Fleming, Fleming, and Johnson
Equivalent Units Schedule
Units in EWIP × Fraction complete:

3. What if EWIP is 70 percent complete? How would this change affect the physical flow schedule? The equivalent units schedule?

Changing the degree of completion the physical flow schedule. However, the equivalent units schedule . There would now be equivalent units for EWIP, the total output for the period to .

Solutions

Expert Solution

1
Fleming, Fleming, and Johnson
Physical Flow Schedule
Units to account for:
Units in BWIP 0
Units Started 6500
Total units to account for 6500
Units accounted for:
Units completed:
From BWIP 0
Started and completed 4600 4600
Units in EWIP 1900
Total Units accounted for 6500
2
Fleming, Fleming, and Johnson
Equivalent Units Schedule
Units completed 4600
Units in EWIP X Fraction Complete 950
Equivalent Units 5550
3
Changing the degree of completion does not affect the physical flow schedule.This schedule measures the flow of units regardless of stage of completion
However, the equivalent units schedule is affected. There would now be 1330 (1900*70%) equivalent units for EWIP, increasing the total output for the period to 5930.

Related Solutions

what is the distinction between physical units and equivalent units ?
what is the distinction between physical units and equivalent units ?
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes...
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes through two processes: Fabrication and Assembly. The following information was obtained for the Fabrication Department for September: All materials are added at the beginning of the process. Beginning work in process had 70,400 units, 40 percent complete with respect to conversion costs. Ending work in process had 12,200 units, 25 percent complete with respect to conversion costs. Started in process, 96,600 units. Required: 1....
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes...
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes through two processes: Fabrication and Assembly. The following information was obtained for the Fabrication Department for September: All materials are added at the beginning of the process. Beginning work in process had 71,200 units, 40 percent complete with respect to conversion costs. Ending work in process had 13,400 units, 20 percent complete with respect to conversion costs. Started in process, 101,200 units. Required: 1....
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes...
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes through two processes: Fabrication and Assembly. The following information was obtained for the Fabrication Department for September: All materials are added at the beginning of the process. Beginning work in process had 74,900 units, 40 percent complete with respect to conversion costs. Ending work in process had 19,600 units, 35 percent complete with respect to conversion costs. Started in process, 109,100 units. Required: 1....
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes...
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes through two processes: Fabrication and Assembly. The following information was obtained for the Fabrication Department for September: All materials are added at the beginning of the process. Beginning work in process had 73,600 units, 40 percent complete with respect to conversion costs. Ending work in process had 15,700 units, 35 percent complete with respect to conversion costs. Started in process, 90,600 units. Required: 1....
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes...
Weighted Average Method, FIFO Method, Physical Flow, Equivalent Units Heap Company manufactures a product that passes through two processes: Fabrication and Assembly. The following information was obtained for the Fabrication Department for September: All materials are added at the beginning of the process. Beginning work in process had 90,300 units, 20 percent complete with respect to conversion costs. Ending work in process had 12,900 units, 20 percent complete with respect to conversion costs. Started in process, 98,200 units. Required: 1....
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 41,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 41,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 40,500 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
Physical Flow, Equivalent Units, Unit Costs, No Beginning WIP Inventory, Activity-Based Costing Lacy, Inc., produces a...
Physical Flow, Equivalent Units, Unit Costs, No Beginning WIP Inventory, Activity-Based Costing Lacy, Inc., produces a subassembly used in the production of hydraulic cylinders. The subassemblies are produced in three departments: Plate Cutting, Rod Cutting, and Welding. Materials are added at the beginning of the process. Overhead is applied using the following drivers and activity rates: Driver Rate Actual Usage (by Plate Cutting) Direct labor cost 120% of direct labor $732,000 Inspection hours $40 per hour 7,450 hours Purchase orders...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT