Question

In: Physics

8. The Navy wants a new airplane launcher for their aircraft carriers that is basically a...

8. The Navy wants a new airplane launcher for their aircraft carriers that is basically a large spring

and your job is to determine the necessary spring constant. The launcher pushes the plane for a

short distance along a much longer runway. During that same time, the plane's jet engines supply

a constant thrust force for the entire length of the runway. The planes need to have a minimum

velocity by the time they reach the end of the runway in order to take off successfully.

Extra Credit Problem Solving Worksheet

1. Focus (on) the Problem.

2. Describe the Physics

3. Plan a Solution

4. Execute Your Plan

5. Evaluate the Answer

Solutions

Expert Solution

As the launcher is going to be fitted onto the deck of an aircraft carrier, the space allocated for the launcher and the distance through which it has to accelerate the plane ill also be specified by Navy. Lets say the distance through which the aircraft will be accelerated by the launcher is 'X', its also given that the launcher will be made of a spring, for which e would need to find the spring constant lets assume it to be 'K', length of runway be 'L' and the thrust force produced by the engine of the aircraft be 'F'.and the mass of the aircraft be 'M'

Work done by the launcher in moving the aircraft trough the specified distance =

work done by thrust force produced by engine of the aircraft =

amount of kinetic energy that will be acquired by the aircraft after reaching the end of runway when it has a minimum velocity needed to takeoff(V)=

from work energy theorem we know that the net external work done on a body is equal to change in kinetic energy of the body.


Related Solutions

Condor Airplane Company has built a new model jet aircraft which it intends to sell to...
Condor Airplane Company has built a new model jet aircraft which it intends to sell to high net worth clients. This aircraft required 25,000 hours to complete. Condor believes an incremental unit-time learning model with an 82% learning curve best reflects the company's production efficiency. Condor just received a contract to make fifteen identical aircraft. What will be the expected unit time for the sixteenth aircraft?
During WWII, the Navy tried to determine where they needed to armor their aircraft to ensure...
During WWII, the Navy tried to determine where they needed to armor their aircraft to ensure they came back home. They ran an analysis of where planes had been shot up, and came up with this. Obviously the places that needed to be up-armored are the wingtips, the central body, and the elevators. That’s where the planes were all getting shot up. Abraham Wald, a statistician, disagreed. He thought they should better armor the nose area, engines, and mid-body. Which...
During WWII, the Navy tried to determine where they needed to armor their aircraft to ensure...
During WWII, the Navy tried to determine where they needed to armor their aircraft to ensure they came back home. They ran an analysis of where planes had been shot up, and came up with this. Obviously the places that needed to be up-armored are the wingtips, the central body, and the elevators. That’s where the planes were all getting shot up. Abraham Wald, a statistician, disagreed. He thought they should better armor the nose area, engines, and mid-body. Which...
Consider an airplane patterned after the Fairchild Republic A-10, a twin-jet attack aircraft. The airplane has...
Consider an airplane patterned after the Fairchild Republic A-10, a twin-jet attack aircraft. The airplane has the following characteristics: wing area = 47 m2, aspect ratio = 6.5, Oswald efficiency factor = 0.87, weight = 103,047 N, and zero-lift drag coefficient = 0.032. The airplane is equipped with two jet engines with 40,298 of static thrust each at sea level. The thrust-specific fuel consumption is 1.0 N of fuel per Newton of thrust per hour. The fuel capacity is 2800...
"An aircraft control actuator is part of the flight control system that enables an airplane to...
"An aircraft control actuator is part of the flight control system that enables an airplane to fly. It is important that the actuators are reliable. Reliability can be defined as the probability a system is functioning, so it is a number between 0 and 1. One way to increase reliability of the actuator is to increase the torque. The reliability R as a function of the maximum torque T (in Newton-meters) is given by R(T)=0.91*exp(0.027T) where torque T is between...
"An aircraft control actuator is part of the flight control system that enables an airplane to...
"An aircraft control actuator is part of the flight control system that enables an airplane to fly. It is important that the actuators are reliable. Reliability can be defined as the probability a system is functioning, so it is a number between 0 and 1. One way to increase reliability of the actuator is to increase the torque. The reliability R as a function of the maximum torque T (in Newton-meters) is given by R(T)=0.91*exp(0.027T) where torque T is between...
An aircraft control actuator is part of the flight control system that enables an airplane to...
An aircraft control actuator is part of the flight control system that enables an airplane to fly. It is important that the actuators are reliable. Reliability can be defined as the probability a system is functioning, so it is a number between 0 and 1. One way to increase reliability of the actuator is to increase the torque. The reliability R as a function of the maximum torque T (in Newton-meters) is given by R(T)=0.91*exp(0.027T) where torque T is between...
1. On January 1, 2020, Hawkeye Air leased a new airplane for a term of 8...
1. On January 1, 2020, Hawkeye Air leased a new airplane for a term of 8 years. The expected life of the airplane is 20 years. There are no rights to purchase the asset at the end of the term, no bargain purchase option, and no residual value guarantee. The lease stipulates that Hawkeye Air makes annual payments of $550,000 beginning at the end of the first year (December 31, 2020). Hawkeye Air has an incremental borrowing rate of 6%...
. CyNaval, Inc. manufactures a specialized tool used in constructing aircraft carriers. Last year, the Company...
. CyNaval, Inc. manufactures a specialized tool used in constructing aircraft carriers. Last year, the Company budgeted for sales of 15,000 tools at $800 per tool, but actually manufactured and sold 16,000 tools for $700 per tool. Actual direct materials purchased and used was 90,000 pounds costing $3,000,000. CyNaval paid $2,500,000 for 60,000 hours of direct labor. Actual fixed overhead cost was $2,000,000, and budgeted fixed overhead cost was $2,200,000. Actual variable overhead cost was $1,600,000. Variable overhead is budgeted...
An aircraft factory manufactures airplane engines. The unit cost C (the cost in dollars to make...
An aircraft factory manufactures airplane engines. The unit cost C (the cost in dollars to make each airplane engine) depends on the number of engines made. If x engines are made, then the unit cost is given by the function C(x)=0.3x2-156x+37,629 .What is the minimum unit cost? Do not round your answer.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT