In: Accounting
Using High-Low to Calculate Fixed Cost, Calculate the Variable Rate, and Construct a Cost Function
Pizza Vesuvio makes specialty pizzas. Data for the past 8 months were collected:
Month | Labor Cost | Employee Hours | |||
---|---|---|---|---|---|
January | $7,000 | 360 | |||
February | 8,140 | 550 | |||
March | 9,899 | 630 | |||
April | 9,787 | 610 | |||
May | 8,490 | 480 | |||
June | 7,450 | 350 | |||
July | 9,490 | 570 | |||
August | 7,531 | 310 |
Pizza Vesuvio's controller wants to calculate the fixed and variable costs associated with labor used in the restaurant.
In your calculations, round the variable rate per employee hour to the nearest cent.
Required:
1. Using the high-low method, calculate the
fixed cost of labor.
$
2. Using the high-low method, calculate the variable rate.
$ per employee hour
3. Using the high-low method, construct the cost formula for total labor cost.
Total labor cost = $ + [$ × Employee hours]
--Step 1
Months |
hours |
Cost |
|
High Level |
Mar |
630 |
$ 9,899.00 |
Low Level |
Aug |
310 |
$ 7,531.00 |
Difference |
320 |
$ 2,368.00 |
--Step 2
Difference in Cost |
$ 2,368.00 |
Difference in hours |
320 |
Variable cost per hour [Requirement 2] |
$ 7.40 |
--Step 3
Working |
High Level |
Low Level |
|
A |
Total Cost |
$ 9,899.00 |
$ 7,531.00 |
B |
Total hours |
630 |
310 |
C |
Variable cost per hour |
$ 7.40 |
$ 7.40 |
D = B x C |
Total Variable cost |
$ 4,662.00 |
$ 2,294.00 |
E = A - D |
Total Fixed Cost [Requirement 1] |
$ 5,237.00 |
$ 5,237.00 |
--Requirement 1: Fixed Cost of Labor = $ 5,237
--Requirement 2: Variable rate = $ 7.40 per employee hour
--Requirement 3: Cost Formula = Fixed Cost + Variable cost per hours x No. of hours
Total Labor Cost = a +bx
Total Labor Cost = $
5,237 + [$ 7.40 x Employee hours]