An X-bar chart with three-sigma limits has parameters as follows:

• UCL = 104

• Center line = 100

• LCL = 96

• n = 9

Suppose that mean of the process quality characteristic shifts to 102, assume standard deviation does not change.

(a) What is average run length until the first point is plotted out of control?

(b) What is the probability that the control chart would exhibit lack of control by at least the third point plotted?

Solutions

Expert Solution


Related Solutions

An x ̅ chart with three-sigma limits has parameters as follows: UCL = 109 Center Line...
An x ̅ chart with three-sigma limits has parameters as follows: UCL = 109 Center Line = 101 LCL = 100 n = 5 Find the ARL1 for the chart. (10 points) What information does ARL convey that the statistical error probabilities do not?
Define the "center line", "LCL" and "UCL" for an p chart and a p bar chart.
Define the "center line", "LCL" and "UCL" for an p chart and a p bar chart.
Determine the Average Run Length (ARL) of a x-bar chart with limits where the process has...
Determine the Average Run Length (ARL) of a x-bar chart with limits where the process has shifted one standard deviation in one direction
what is the type 1 error of an x bar chart with 1 - sigma control...
what is the type 1 error of an x bar chart with 1 - sigma control limits? what is the type 1 error of an x bar chart with 2 - sigma control limits? what is the type 1 error of an x bar chart with 3 - sigma control limits? what is the type 1 error of an x bar chart with 4 - sigma control limits?
Miller Inc. has decided to use a p-Chart with 3-sigma control limits to monitor the proportion...
Miller Inc. has decided to use a p-Chart with 3-sigma control limits to monitor the proportion of defective metal shafts produced by their production process. The quality control manager randomly samples 150 metal shafts at 14 successively selected time periods and counts the number of defective metal shafts in the sample. Step 1 of 8: What is the Center Line of the control chart? Round your answer to three decimal places. Step 2 of 8: What value of z should...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a control chart, and calculate the percentage of units that are expected to be out of spec (z-value). Please show all work for how all calculations were computed. Filling Line Checks - ounces Specification: 12 ounces min; max - 15 ounces Sample Sample Times Number 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 1 12.5 12.4 12.4 12.8 13 12.8 12.8 13 2 12.4 12.4...
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this...
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. Sampling 44 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results:    Hour Bold x overbarx R Hour Bold x overbarx R Hour Bold x overbarx R Hour Bold x overbarx R 1 3.153.15 " 0.650.65 " 7 3.053.05 " 0.580.58 " 13 3.113.11 " 0.800.80 " 19 4.514.51 "...
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this...
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. Sampling 4 pieces of​ precision-cut wire​ (to be used in computer​ assembly) every hour for the past 24 hours has produced the following​ results:                                                                                                                                                         Hour Bold x overbar R Hour Bold x overbar R Hour Bold x overbar R Hour Bold x overbar R 1 3.15​" 0.65​" 7 2.95​" 0.58​" 13 3.11​" 0.80​" 19 3.41​" 1.66​" 2 3.10 1.18 8 2.75 1.08 14...
1. X-bar is an unbiased estimator of µ because a. standard error of X-bar equals sigma/...
1. X-bar is an unbiased estimator of µ because a. standard error of X-bar equals sigma/ square root of n b. expected value of X-bar equals µ c. shape of distribution of X-bar is normal. d. Expected value of X-bar is greater than 1. 2. Suppose professor finds that for 16 randomly selected students the time needed to complete an assignment had a sample mean of 65 minutes and a sample standard deviation of 40 minutes. The 98% confidence interval...
For following data: a. Construct an R-chart for this process. b. Construct an X-bar chart for...
For following data: a. Construct an R-chart for this process. b. Construct an X-bar chart for this process. c. Does the process appear to be in control? Why or why not? ​ d. Why must the R chart be read before the x-chart? Hour Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 1 98.2706 98.82376 101.8175 100.1819 102.9594 101.165 95.25957 98.97423 2 100.7166 101.8866 98.56813 98.77126 101.8273 98.20298 101.6975 99.63706 3 98.9922...