Assume a project to install 200 Desktop with an approved budget of SR800 each and 200 Laptop with an approved budget of SR 1200 each, in the period of 12 months. The total project budget is SR 400000. After six months, it is found that 80 Desktop & 80 Laptops have been installed, at a cost of SR176000. According to the plan, 100 Desktop & 100 Laptops should have installed in a period of six months. According to this progress how much extra cost and time need to complete the project.
1. BCWS :
2. BCWP :
3. ACWP :
4. Time :
5. Cost :