Question

In: Statistics and Probability

Use the data in the table below for this week’s assignment Production (millions of vehicles) MANUFACTURER...

Use the data in the table below for this week’s assignment

Production (millions of vehicles)

MANUFACTURER

Year 1

Year 2

Year 3

Year 4

Year 5

TOYOTA

8.04

8.53

9.24

7.23

8.56

GM

8.97

9.35

8.28

6.46

8.48

VOLKSWAGEN

5.68

6.27

6.44

6.07

7.34

HYUNDAI

2.51

2.62

2.78

4.65

5.76

Instructions:

  1. Input the data into an SPSS work sheet. Make sure that all your variables are labelled appropriately (Need to show how to properly set up the variables for charting purposes)
  2. Construct a line graph for the time series data years 1 through 5 showing the number of vehicles manufactured by each automotive company. Show the time series for all four manufacturers on the same graph
  3. What does the line chart indicate about vehicle production amounts from years 1 through 5?
  4. Construct a clustered-bar chart showing vehicles produced by automobile manufacturers using the year 1 through 5 data. Represent the years of production along the horizontal axis, and cluster the production amounts for the manufacturers in each year.
  5. Which company is the leading manufacturer in each year?
  6. Save all your commands to a syntax file

Solutions

Expert Solution

The SPSS worksheet set up is as follows:

The line graph for all four manufacturers is:

The line chart indicates that vehicle production amounts from years 1 through 5 is fluctuating from year to year and brand to brand.

The clustered-bar chart is:

GM is the leading manufacturer in year 1.

TOYOTA is the leading manufacturer in year 2.

TOYOTA is the leading manufacturer in year 3.

GM is the leading manufacturer in year 4.

GM is the leading manufacturer in year 5.

The SPSS syntax is:

WEIGHT BY Production.
GRAPH
/LINE(SIMPLE)=MEAN(Production) BY Manufacturer
/PANEL ROWVAR=Year ROWOP=CROSS.

WEIGHT BY Production.
GRAPH
/BAR(GROUPED)=COUNT BY Manufacturer BY Production
/PANEL ROWVAR=Year ROWOP=CROSS.


Related Solutions

The data below was collected from manufacturer advertisements of their vehicles horsepower and highway gas mileage...
The data below was collected from manufacturer advertisements of their vehicles horsepower and highway gas mileage (mpg.). Use this data to answer the following questions. x 158 250 340 350 390 190 220 y 33 28 15 17 11 35 42 1. Find the the correlation coefficient. Round your final answer to four decimal places. r=r=   2. Write the regression equation below. Round all numbers to four decimal places. ˆy=y^= 3. Using the data shown above,predict the the highway gas...
Use the cash flows and competitive spreads shown in the table below. ($ millions) Year 0...
Use the cash flows and competitive spreads shown in the table below. ($ millions) Year 0 Year 1 Year 2 Years 3–10 Investment 180 Production (millions of pounds per year) 0 0 48 88 Spread ($ per pound) 1.03 1.03 1.03 1.03 Net revenues 0 0 49.44 90.64 Production costs 0 0 38.00 38.00 Transport 0 0 0 0 Other costs 0 28 28 28 Cash flow –180 28 –16.56 –24.64 NPV (at r = 7%) = 0 Assume the...
Use the cash flows and competitive spreads shown in the table below. ($ millions) Year 0...
Use the cash flows and competitive spreads shown in the table below. ($ millions) Year 0 Year 1 Year 2 Years 3–10 Investment 180 Production (millions of pounds per year) 0 0 59 99 Spread ($ per pound) 1.14 1.14 1.14 1.14 Net revenues 0 0 67.26 112.86 Production costs 0 0 49.00 49.00 Transport 0 0 0 0 Other costs 0 39 39 39 Cash flow –180 39 –20.74 –24.86 NPV (at r = 6%) = 0 Assume the...
Below is data captured from last week’s production numbers on machining center AG-03: Scheduled operation =...
Below is data captured from last week’s production numbers on machining center AG-03: Scheduled operation = 10 hours per shift, 1 shift, 5 days per week Lunch = 30 minutes per day Breaks = Two 15 minutes per day Morning Huddle Meeting = 10 minutes per day Planned 5S Activities = 5 minutes per day Planned Maintenance = 25minutes per week Standard cycle time = 0.5 minutes per unit Below is the Operator Downtime Log Sheet for the Week on...
This week’s assignment is a position paper. Below are two statements of which you will select...
This week’s assignment is a position paper. Below are two statements of which you will select one to be the basis of the assignment. You are then asked to determine if you will take a pro (agree) or con (disagree) position on the statement. You must then (in 1 page) argue your position of pro or con. Remember, you are to select one statement only. You should restate the quote at the beginning of your paper (center it), and then...
Alternative-Fueled Vehicles The table shows the numbers (in thousands) of alternative-fueled vehicles A in use in...
Alternative-Fueled Vehicles The table shows the numbers (in thousands) of alternative-fueled vehicles A in use in the United States from 1995 to 2011. (Source: U.S. Energy Information Administration) Year Number of vehicles, A 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 246.9 265.0 280.2 295.0 322.3 394.7 425.5 471.1 534.0 565.5 592.1 634.6 695.8 775.7 826.3 938.6 1191.8 (a) Use a graphing utility to plot the data. Let t represent the...
ASSIGNMENT: Enter the hypothetical data below in SPSS to use for the assignment.  The SPSS commands: 'file',...
ASSIGNMENT: Enter the hypothetical data below in SPSS to use for the assignment.  The SPSS commands: 'file', 'new', 'data' will create a spreadsheet in which to enter the data below (manually). Case Control Treatment 1                              5                              6 2                              4                              7 3                              5                              5              4                              4                              6 5                              5                              5 6                              6                              6 7                              5                              5 8                              4                              6 9                              5                              5 10                           5                              10 In this experiment, all participants rated the credibility of fake news stories on a scale of 1...
Assignment: Data Quality Directions: Complete the table below by defining each data characteristic and providing an...
Assignment: Data Quality Directions: Complete the table below by defining each data characteristic and providing an example of each quality characteristic as it relates to coding. Data Characteristic Definition Coding Example Accuracy Accessibility Comprehensiveness Consistency Currency Definition Granularity Precision Relevancy Timeliness
A manufacturer is going to produce four products. The relative data for production are listed below....
A manufacturer is going to produce four products. The relative data for production are listed below.                      setup cost              unit profit          resource used product 1        400                        100                    10 product 2        400                       60                      5 product 3        500                        120                    12 product 4        600                        160                    16 --The total resource available is 1000. --product 2 and 4 are mutually competitive items, hence will not be produced at the same time. --Product 1 will be produced only if product 3 is...
The data in the table below presents the hourly quantity of production for three lines of...
The data in the table below presents the hourly quantity of production for three lines of production processes over the first 4 days in XYZ Company. Answer the questions based on the Excel Output given below. Day Process 1 Process 2 Process 3 1 33 33 28 2 30 35 36 3 28 30 30 4 29 38 34 ANOVA: Single Factor SUMMARY Groups Count Sum Average Variance Process 1 4 120 30 4.66667 Process 2 4 136 34 11.3333...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT