Question

In: Operations Management

Which of the following are measures of capacity in terms of outputs and inputs produced for...

Which of the following are measures of capacity in terms of outputs and inputs produced for the corresponding production system?

Select one:

A. Airline – customers checked out per hour – reservation calls handled per day

B. Supermarket – available seat miles per year – cartons unloaded per hour

C. University – graduates per year – students admitted per year

D. Automobile assembly plant – autos assembled per year –packages delivered per day

In planning the long-term capacity of an operation, one should take into account:

Select one:

A. Bottlenecks

B. Economies of scale

C. Economies of scope

D. Only B and C

When a resource is scheduled as if it had unlimited capacity to handle any and all jobs, its schedule is called

Select one:

A. Bottleneck

B. Infinite loading

C. Finite loading

D. Cycle time

The __________ plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost.

Select one:

A. Production

B. Rough-cut capacity

C. Long-term

D. Efficiency

E. Aggregate

__________ means deciding which jobs to assign to which work centers.

Select one:

A. Loading

B. Sequencing

C. MRP

D. Facility planning

E. MPS

Solutions

Expert Solution

C. University – graduates per year – students admitted per year are measures of capacity in terms of outputs and inputs produced for the corresponding production system. Whereas the remaining ones are not applicable in this context.

D. Only B and C. Economies of scale and economies of scope are something that one should take into account in planning the long-term capacity. Whereas the remaining one is not appropriate in this context.

B. Infinite loading is the term that is used for the schedule when a resource is scheduled as if it had unlimited capacity to handle any and all jobs. Whereas the remaining terms are not applicable in this context.

E. Aggregate plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost. Whereas the remaining ones are not relevant in this context.

A. Loading means deciding which jobs to assign to which work centers. Whereas the remaining ones are not appropriate terms to be used in this context.

Note: If this answer has helped you, please give an Up-vote, this will encourage me, thank you!


Related Solutions

Consider the following inputs and outputs associated with a DCS system.
  Consider the following inputs and outputs associated with a DCS system. It is interesting to note that EXACTLY the same could be applicable to a SCADA system (although the SCADA system could use either a dedicated RTU or else a PLC). Break the following signals up (either going to, or away from the RTU-type devices) and indicate which are: i) digital inputs, ii) digital outputs, iii) analog inputs and iv) analog outputs: 18.1 ( 1 mark) START signal 18.2...
Aerobic Respiration Steps Where in the cell Inputs or Reactants Outputs or Products Net ATP Produced...
Aerobic Respiration Steps Where in the cell Inputs or Reactants Outputs or Products Net ATP Produced 1. Glycolysis Cytoplasm 2. Pyruvate Oxidation 3. Citric Acid or Krebs Cycle 4. Electron Transport Chain t Chain
Describe, in general terms, what occurs in glycolysis (including energy investments, energy yields and carbon inputs/outputs)
Describe, in general terms, what occurs in glycolysis (including energy investments, energy yields and carbon inputs/outputs)
Explain the inputs (and outputs if you know them) of the following Excel functions: • Norm.S.Dist()....
Explain the inputs (and outputs if you know them) of the following Excel functions: • Norm.S.Dist(). • Norm.Inv(). • T.Dist().
Write a Java program for RSA encryption that has the following inputs and outputs: Given a...
Write a Java program for RSA encryption that has the following inputs and outputs: Given a message and an integer n = pq where p and q are odd primes and an integer e > 1 relatively prime to (p − 1)(q − 1), encrypt the message using the RSA cryptosystem with key (n, e).
This is a question on the inputs and outputs on Basic javascript application What is the...
This is a question on the inputs and outputs on Basic javascript application What is the displayed output of the application if the user inputs Are: 1    in the first box, 2 in the second box, 3 in the third box, and 4 in the fourth box Modify the HTML and javascript file in order to Creates an h1 and a span element ii)          Accesses all the html elements, then adds the four input values as strings and sends the...
describe the inputs, the plants, and the outputs of open-loop control systems.
describe the inputs, the plants, and the outputs of open-loop control systems.
What are the outputs of the "Define activity phase" and the inputs to the "Sequence activity...
What are the outputs of the "Define activity phase" and the inputs to the "Sequence activity phase" in the project time management? Explain why the schedule produced by the Sequence activity phase cannot be used as a reference to manage the time of the project
Identify inputs, outputs and value addition tasks for the following services: a) Banking b) Courier c)...
Identify inputs, outputs and value addition tasks for the following services: a) Banking b) Courier c) Insurance d) Retail Outlets e) Airlines
why the production function evaluates the relation between the inputs and outputs is important in the...
why the production function evaluates the relation between the inputs and outputs is important in the healthcare field.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT