In: Accounting
Calculate Lead Time
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 73 units. The process time for each step is as follows:
Process Step 1 | 6 | minutes |
Process Step 2 | 8 | minutes |
Process Step 3 | 5 | minutes |
Process Step 4 | 4 | minutes |
The time required to move each batch between steps is 10 minutes. In addition, the time to move raw materials to Process Step 1 is also 10 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 10 minutes.
The new lean layout will allow the company to reduce the batch sizes from 73 units to 4 units. The time required to move each batch between steps and the inventory locations will be reduced to 2 minutes. The processing time in each step will stay the same.
Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.
Present Approach | Proposed Approach | |||
Value-added time | min | min | ||
Non-value-added time | min | min | ||
Total lead time | min | min | ||
Value-added ratio (as a percent) | % | % |
Feedback
Ans:
Present Approach
Valued added time = 6+8+5+4 = 23 min
Non Value Added time=Total Within batch wait time + Move
time
={Total time required for the four steps* (Batch-1)} + Move
time
Non-Value Added Time = Value Added Time * (Batch size -1) + move time between each step
={6+8+5+4)*(73-1)} +10*5=23*72 +50=1706
Total lead time = 23+1706 = 1729 min
Value added ratio = Value added time / Total lead time = 23/1729= 1.33%
Proposed Approach
Valued added time = 6+8+5+4 = 23 min
Non-Value Added time
Non Value Added time=Total Within batch wait time + Move
time
={Total time required for the four steps* (Batch-1)} + Move
time
={6+8+5+4 )(4-1)} +5*2=23*3 +10=79
Total lead time = 23+79 = 102 min
Value added ratio = Value added time / Total lead time = 23/102 =22.5490 %=22.55% If rounded off
Present Approach |
Proposed Approach |
|||
Value-added time |
23 |
min |
23 |
min |
Non-value-added time |
1729 |
min |
79 |
min |
Total lead time |
1729 |
min |
102 |
min |
Value-added ratio (as a percent) |
1.3 |
% |
22.5 |
% |