You are a consultant to a large manufacturing corporation that is considering a project with the following net after-tax cash flows (in millions of dollars):

Years from Now After-Tax Cash Flow
0 –40
1–10 14

The project's beta is 1.9.

a. Assuming that rf = 6% and E(rM) = 12%, what is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.)

b. What is the highest possible beta estimate for the project before its NPV becomes negative? (Round your answer to 2 decimal places.)

Solutions

Expert Solution


Related Solutions

You are a consultant to a large manufacturing corporation that is considering a project with the...
You are a consultant to a large manufacturing corporation that is considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax Cash Flow 0 -100 1-10 18 The project's beta is 1.1. a. Assuming that rf = 5% and E(rM) = 10%, what is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) Net Present Value b. What is...
You are a consultant to a large manufacturing corporation that is considering a project with the...
You are a consultant to a large manufacturing corporation that is considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax Cash Flow 0 –90 1–10 17 The project's beta is 1.2. a. Assuming that rf = 4% and E(RM) = 11%, what is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) b. What is the highest possible...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax CF 0 –24 1–9 10 10 20 The project's beta is 1.8. Assuming rf = 4% and E(rM) = 14% a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) b. What is the highest possible beta estimate...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars). Years From Now After-tax CF 0 -36 1-9 12 10 24 The project's beta is 1.5. Assuming rf = 4% and E(rm) = 12% a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places) b. What is the highest possible beta estimate...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax CF 0 –36 1–9 12 10 24 The project's beta is 1.5. Assuming rf = 4% and E(rM) = 12% a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) Net present value 24.72 million b. What is...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax CF 0 –23 1–9 10 10 20 The project's beta is 1.7. Assuming rf = 6% and E(rM) = 16%. a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.)   Net present value million b. What is the...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After Tax CF 0 -38 1-9 12 10 24 The project's beta is 1.4. Assuming rf = 6% and E(rM) = 16% a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) b. What is the highest possible beta...
You are a consultant to a large manufacturing corporation considering a project with the following net...
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars): Years from Now After-Tax CF 0 –36 1–9 12 10 24 The project's beta is 1.5. Assuming rf = 4% and E(rM) = 12% a. What is the net present value of the project? (Do not round intermediate calculations. Enter your answer in millions rounded to 2 decimal places.) Net present value million b. What is the...
You are an analyst for a pipe manufacturing corporation that is considering a new project which...
You are an analyst for a pipe manufacturing corporation that is considering a new project which involves fabricating some custom pipe for a single customer. The project will take advantage of excess capacity in an existing plant. The plant has the capacity to produce 50,000 units of 18-inch pipe, but only 25,000 are being produced currently. Sales of 18-inch pipe are expected to increase by 10% a year. You want to use some of the remaining capacity to manufacture 20,000...
A large manufacturing company in Jubail is considering an electric power plant project in order to...
A large manufacturing company in Jubail is considering an electric power plant project in order to save on their electric power consumption by generating its own power supply. The company currently uses 552,000 kW of electric energy a year and pays an average of $3.05 per kwh. The construction of the power plant would require an initial cost of $1,600,000 now plus an additional $950,000 investment at the end of the first year. It is expected to be operational for...