Question

In: Math

A bridge on a small, rural road is designed to hold 10 cars when it is...

A bridge on a small, rural road is designed to hold 10 cars when it is full and its maximum continuous weight that the bridge is designed to hold is 39,000 pounds. Assume that the average American car weighs 3750 pounds and that American cars' weights have a standard deviation of 200 pounds. If the bridge is fully loaded with 10 cars, what is the probability that it will be overloaded? Hint: Think about what the bridge designer thought the average weight of car that the bridge would hold would be and remember to draw a picture of the distribution to determine how you are treating the probability!

Do you think that the bridge in the previous question is safe to use? Why or why not?

Solutions

Expert Solution


Related Solutions

When the federal government builds a project such as a dam, a road, or a bridge,...
When the federal government builds a project such as a dam, a road, or a bridge, it conducts a cost-benefit analysis in which the total costs of building the project are compared with the total benefits the project is supposed to bring. For example, in the aforementioned Tellico Dam, the costs of building the dam over the few years it took to build the dam and clear the land for the reservoir were approximately $100 million. The government (Tennessee Valley...
AZRB is a road bridge construction company. The company plan to build a major road bridge...
AZRB is a road bridge construction company. The company plan to build a major road bridge for its new project. Table shows the process sequence and other related data for the major road bridge development. Table :Activities to construct the bridge, estimated time and crashing cost. Activity Predecessor Time Estimates (Days) Cost (RM per day) Crash cost (RM per day) Optimistic Most Likely Pessimistic Maximum crash time (days) a m b A - 65 73 90 100 150 6 B...
The production of cars leads to more cars on the road and more pollution in the...
The production of cars leads to more cars on the road and more pollution in the air. Graph the MC, MSC, and MSB of cars. Now label the efficient and inefficient market equilibriums, quantity and price. Show the DWL. What are 3 ways we overcome the inefficiency in the market? Show graphically how a tax can overcome the inefficiency in the market?
The cost of grading and spreading gravel on a short rural road is expected to be...
The cost of grading and spreading gravel on a short rural road is expected to be $300,000. The road will have to be maintained at a cost of $25,000 per year. Even though the new road is not very smooth, it allows access to an area that previously could only be reached with off-road vehicles. The improved accessibility has led to a 150% increase in the property values along the road. If the previous market value of a property was...
A rock is thrown upward from a bridge that is 31 feet above a road. The...
A rock is thrown upward from a bridge that is 31 feet above a road. The rock reaches its maximum height above the road 0.57 seconds after it is thrown and contacts the road 2.53 seconds after it was thrown. Write a function ff that determines the rock's height above the road (in feet) in terms of the number of seconds tt since the rock was thrown. f(t)=
A rock is thrown upward from a bridge that is 59 feet above a road. The...
A rock is thrown upward from a bridge that is 59 feet above a road. The rock reaches its maximum height above the road 0.9 seconds after it is thrown and contacts the road 2.4 seconds after it was thrown. Write a function f that determines the rock's height above the road (in feet) in terms of the number of seconds t since the rock was thrown. f(t)=    Hint: the function f can be written in the form f(t)=c⋅(t−t1)(t−t2) for...
A traffic engineer needs to determine the AADT on a rural primary road that has the...
A traffic engineer needs to determine the AADT on a rural primary road that has the volume distribution characteristics shown in the following tables. He collected the following data on a Wednesday during the month of August. What is the estimated AADT of the road using following information (Traffic volume, HEF, DEF, and MEF factors)? (6.5 points)? Time Traffic Volume (veh/hr) 8 to 9 am 450 9 to 10 am 550 10 to 11 am 600 11 am to 12...
Imagine a tollbooth at a bridge. Cars passing by the booth are expected to pay a...
Imagine a tollbooth at a bridge. Cars passing by the booth are expected to pay a 50 cent toll. Mostly they do, but sometimes a car goes by without paying. The tollbooth keeps track of the number of cars that have gone by, and of the total amount of money collected. Model this tollbooth with a class called tollBooth. The two data items are a type unsigned int to hold the total number of cars, and a type double to...
If a bridge is above a river approximately 10 miles from the sea with a bridge...
If a bridge is above a river approximately 10 miles from the sea with a bridge deck of 170m What type of concrete is should be used? will it be sulphate resistant concrete or high performance concrete or any other? What will the Eurocode exposure class be ? will it be XS1 or XD1? or something else? Will it be EN206/BS8500 type of concrete?
. A prestressed road bridge of span 16 + 0.01 (35× 2) m consists of a...
. A prestressed road bridge of span 16 + 0.01 (35× 2) m consists of a concrete slab of 420 mm thick with parallel post-tensioned cables, in each of which the force at transfer is 440 kN. If the bridge is required to support a uniformly distributed applied load of 38 + 0.01 (135) kN/m , with tensile stress in the concrete not exceeding 0.85 N/mm2 at any time. Calculate the maximum horizontal spacing of the cables, their distance from...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT