Question

In: Civil Engineering

How to start the operation of HVAC sizing of a building?

How to start the operation of HVAC sizing of a building?

Solutions

Expert Solution

  • Every HVAC system has basic components in common, although there’s many ways to implement and optimize them.
  • Our air conditioner must be precisely sized in order to reach its optimal energy efficiency and performance level. An undersized system won't cool sufficiently and will work overtime in attempt to compensate, causing early wear. An oversized system will cycle on and off frequently, causing temperature swings and hot and cold spots, leaving behind excess humidity, and wasting energy.
  • Right sizing” an HVAC system improves efficiency, reduces noise, offers greater cooling/heating comfort and saves money. An oversized system increases installation costs, wastes energy, and costs more in overall operating costs than correctly sized systems
  • Most HVAC systems are sized to meet heating and cooling loads occurring around 1% to 2.5% of the time, but an efficient system works most effectively for the conditions occurring 97.5% to 99% of the time, according to the National Institute of Building Sciences.

HVAC system function in large building

  • The compressor compresses refrigerant, increasing its pressure and temperature.
  • Hot, outside air is blown over the refrigerant vapor by the condenser to liquefy it.
  • The expansion valve changes refrigerant into a low-pressure liquid, thus cooling it.
  • Heat is transferred by the evaporator to transform the cool liquid to a warmer gas.

No matter how big your building, basic concepts remain the same, though the using of cooling towers and “free cooling” can make things more complex. In an electrical system, the heating cycle is very similar to the cooling cycle.


Related Solutions

The architectural and HVAC plans for the Uytengsu Building on campus are provided. The details of...
The architectural and HVAC plans for the Uytengsu Building on campus are provided. The details of the equipment installed are provided. From this information determine the estimated overall building heating and cooling requirements and compare to the "rule of thumb" information given in the first chapter. Briefly, write up your findings in a technical memorandum showing your calculations stating any assumptions. Upload your findings in a pdf.
Design an HVAC system for an office building. All of the offices should be maintained at...
Design an HVAC system for an office building. All of the offices should be maintained at 72°F. Model a corner office, 6m by 6m and 2m high. Make the exterior walls glass and the interior walls are drywall at the ambient temperature. Model a cold winter day as -5°C with a 10 m/s wind and a hot summer day at 40°C with a 4 m/s wind. Model a person as a 37°C vertical cylinder with 1 m2 surface area 170...
(HVAC) For a specific building with a specific user, we have calculated the heating load. if...
(HVAC) For a specific building with a specific user, we have calculated the heating load. if we use deferent heat provider such as hot water,gas heaters or radiators , would it be a change in calculated heating load?? in other words Is the calculation of heating load independent of the type of heating system?
A heat pump-bases HVAC system can remove heat from a building by (a) compressing the refrigerant...
A heat pump-bases HVAC system can remove heat from a building by (a) compressing the refrigerant to make it hotter than the outside air (b) compressing the refrigerant to make it cooler than the outside air (c) expanding the refrigerant to make it hotter than the outside air (d) blowing the heat out of the building using a fan
How can an individual overcome de-motivation and start building motivation to the goals?
How can an individual overcome de-motivation and start building motivation to the goals?
How important is lot sizing? How should managers choose an Appropriate lot size? Should it be...
How important is lot sizing? How should managers choose an Appropriate lot size? Should it be chosen strictly on economic basis, or should intangible factors be considered.
(HVAC) in design of a channel network for distribution of air How and With what equipment...
(HVAC) in design of a channel network for distribution of air How and With what equipment the final adjustment of the flow of air reaches to each region is Set?
How do HVAC system components affect the work of an interior designer?
How do HVAC system components affect the work of an interior designer?
Listed below are the financials for Baecker HVAC Air Conditioning who service provides local HVAC services...
Listed below are the financials for Baecker HVAC Air Conditioning who service provides local HVAC services in Southern California. The data appears as follows:   Baecker HVAC Company Statements of Financial Position Beginning Balance Ending Balance Assets: Cash $ 288,000 $ 189,663 Accounts receivable 126,000 191,000 Inventory 264,000 286,000 Plant and equipment (net) 442,000 450,000 Investment in Cedar Company 243,000 262,000 Land (undeveloped) 458,000 458,000 Total assets $ 1,821,000 $ 1,836,663 Liabilities and owners' equity: Accounts payable $ 252,000 $ 223,000...
PRODUCTION AND OPERATION MANAGEMENT PROJECT - PLANT LAYOUT Mr. Mohammed wanted to start a factory in...
PRODUCTION AND OPERATION MANAGEMENT PROJECT - PLANT LAYOUT Mr. Mohammed wanted to start a factory in Samail area. He is planning to produce petrochemical products as the subsidiary of PDO. His factory includes 8 different process and one office building, security check point and a store room for keeping all finished products preferably at the end of production process. The company planning to have the following process in the factory premises. 1. Material receiving section 2. Quality inspection of material...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT