Question

In: Civil Engineering

Consider a residential building with 5 floors with two homes at every flat each having 3...

Consider a residential building with 5 floors with two homes at every flat each having 3 m height. You want to design such a piping system that provides the same mass flow rate to all floors with same outlet pressure. Come up with such a piping system that uses only one pump for the whole installment. Draw your system, make your assumptions, and show your results with a case study.

Solutions

Expert Solution


Related Solutions

Consider a residential building with 5 floors with two homes at every flat each having 3...
Consider a residential building with 5 floors with two homes at every flat each having 3 m height. You want to design such a piping system that provides the same mass flow rate to all floors with same outlet pressure. Come up with such a piping system that uses only one pump for the whole installment. Draw your system, make your assumptions, and show your results with a case study. (Hint: Minor losses may help! You may check pipe sizes...
Calculate the firewater demand in (m3/min) for a building having 25 floors including basement. Building is...
Calculate the firewater demand in (m3/min) for a building having 25 floors including basement. Building is constructed with non-combustible construction material and serving total population of 1400. Assume area of each floor as 9800 ft2. Using following formulas:                                 [5 Marks] a). Insurance Services Office Formula b). Equation for National Board of Fire Underwriters c). If fire water demand is required for 4 hours calculate the volume of water storage tank in m3 (For Part b only) Instructions: Find the values...
Consider a class called Building. This class consists of a number of floors (numberOfFloors) for the...
Consider a class called Building. This class consists of a number of floors (numberOfFloors) for the building, a current floor for the elevator (current), a requested floor of a person waiting for the elevator (requestedFloor), and methods for constructing the building object, for moving the elevator one floor up, for moving the elevator one floor down, for requesting the elevator and for starting the elevator going. Assume that requestedFloor will be set to 0 if there are currently no requests...
Joan Horton is a building contractor whose company builds many homes every year. In planning for...
Joan Horton is a building contractor whose company builds many homes every year. In planning for each job, Joan needs some idea about the direct labor hours per square foot required to build a home. She has collected sample information on the labor hours for 10 jobs during the past year. (300 words, or 4 paragraphs) Job 1 2 3 4 5 6 7 8 9 10 Hours 245 291 353 118 152 402 351 242 595 173 Calculate the...
Joan Horton is a building contractor whose company builds many homes every year. In planning for...
Joan Horton is a building contractor whose company builds many homes every year. In planning for each job, Joan needs some idea about the direct labor hours per square foot required to build a home. She has collected sample information on the labor hours for 10 jobs during the past year. (300 words, or 4 paragraphs) Job 1 2 3 4 5 6 7 8 9 10 Hours 245 291 353 118 152 402 351 242 595 173 Calculate the...
There are two loops, each having a 5-cm-radius. Each of the loops is charged to +20nC....
There are two loops, each having a 5-cm-radius. Each of the loops is charged to +20nC. The loops are oriented with their faces to each other and are .20 m apart. a) Find the electric field strength and direction halfway along an imaginary line connecting the centers of the two loops. (Do not just write down the answer, but show how you obtain it). b) If the left loop is now taken away, what is the electric field strength and...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow.    Depreciation—Building $ 31,500 Interest—Building mortgage 47,250 Taxes—Building and land 14,000 Gas (heating) expense 4,375 Lighting expense 5,250 Maintenance expense 9,625 Total occupancy cost $ 112,000 The building has 7,000 square feet on each floor. In prior...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow.    Depreciation—Building $ 27,000 Interest—Building mortgage 40,500 Taxes—Building and land 12,000 Gas (heating) expense 3,750 Lighting expense 4,500 Maintenance expense 8,250 Total occupancy cost $ 96,000 The building has 6,000 square feet on each floor. In prior...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow. Depreciation—Building $ 18,000 Interest—Building mortgage 27,000 Taxes—Building and land 8,000 Gas (heating) expense 2,500 Lighting expense 3,000 Maintenance expense 5,500 Total occupancy cost $ 64,000 The building has 4,000 square feet on each floor. In prior periods,...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow.    Depreciation—Building $ 31,500 Interest—Building mortgage 47,250 Taxes—Building and land 14,000 Gas (heating) expense 4,375 Lighting expense 5,250 Maintenance expense 9,625 Total occupancy cost $ 112,000 The building has 7,000 square feet on each floor. In prior...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT