Question

In: Math

A production facility employs 16 workers on the day shift, 14 workers on the swing shift,...

A production facility employs 16 workers on the day shift, 14 workers on the swing shift, and 8 workers on the graveyard shift. A quality control consultant is to randomly select 6 of these workers for in-depth interviews.
(a) What is the probability that all 6 selected workers will be from the same shift?
(b) What is the probability that at least two different shifts will be represented among the selected workers?
(c) What is the probability that exactly 2 of the workers in the sample come from the day shift?

Solutions

Expert Solution

Solution:

   We are given that: A production facility employs

16 workers on the day shift,

14 workers on the swing shift, and

8 workers on the graveyard shift.

Thus total number of workers = 16+14+8=38

A quality control consultant is to randomly select 6 of these workers for in-depth interviews.

Part a) Find the probability that all 6 selected workers will be from the same shift.

That is:

P(all 6 selected workers will be from the same shift) = P( All 6 workers from Day shift or All 6 workers from Swing shift or All 6 workers from graveyard shift)

P(all 6 selected workers will be from the same shift) = P( All 6 workers from Day shift)

                              + P(All 6 workers from Swing shift) + P(All 6 workers from graveyard shift)

P(all 6 selected workers will be from the same shift)

where

and

Thus

P(all 6 selected workers will be from the same shift)

( Kindly please check number of decimal places that we have to round. it is not mentioned in the given question)

Part b) Find the probability that at least two different shifts will be represented among the selected workers.

P( At least two different shift) = .....?

P( At least two different shift) = 1 - P( All represented exactly 1 shift ( same shift) )

P( At least two different shift) = 1 - 0.003999

P( At least two different shift) =0.996001

P( At least two different shift) = 0.9960

Part c) Find the probability that exactly 2 of the workers in the sample come from the day shift.

P( 2 workers from Day shift ) = ....?

P( 2 workers from Day shift ) = P( 2 from day shift and remaining 4 from (14+8)=22 others )

P( 2 workers from Day shift )

where

thus

P( 2 workers from Day shift )

( Kindly please check number of decimal places that we have to round. it is not mentioned in given question)


Related Solutions

A production facility employs 20 workers on the day shift, 15 workers on the swing shift,...
A production facility employs 20 workers on the day shift, 15 workers on the swing shift, and 10 workers on the graveyard shift. A quality control consultant is to select 5 of these workers for in-depth interviews. Suppose the selection is made in such a way that any particular group of 5 workers has the same chance of being selected as does any other group (drawing 5 slips without replacement from among 45). How many selections result in all 5...
A production facility employs 15 workers on the day shift, 9 workers on the swing shift,...
A production facility employs 15 workers on the day shift, 9 workers on the swing shift, and 6 workers on the graveyard shift. A quality control consultant is to select 5 of these workers at random for in-depth interviews. (a) Find the number of outcomes in the event that all 5 of the selected workers come from the same shift. (b) Find the number of outcomes in the event that the sample of 5 workers contains at least one worker...
A warehouse employs 28 workers on first​ shift, 15 workers on second​ shift, and 10 workers...
A warehouse employs 28 workers on first​ shift, 15 workers on second​ shift, and 10 workers on third shift. Eight workers are chosen at random to be interviewed about the work environment. Find the probability of choosing exactly five first​-shift workers. The probability of choosing exactly five first​-shift workers is nothing. ​(Round to three decimal places as​ needed.)
The table below shows the number of graveyard shift, swing shift, and day shift workers (variable called JOB SHIFT) by "coffee drinking" and "non-coffee drinking" (variable called AWAKE)
  The table below shows the number of graveyard shift, swing shift, and day shift workers (variable called JOB SHIFT) by "coffee drinking" and "non-coffee drinking" (variable called AWAKE). Test the null hypothesis that the two variables are unrelated by doing the following: (Answer: Chi-square = 10.08) State the null and research hypotheses. Report the degrees of freedom. Report the critical value (use alpha = .05) Calculate the test statistic In two or three sentences, briefly explain the results (this...
The Quality Control Department employs five technicians during the day shift. Listed below is the number...
The Quality Control Department employs five technicians during the day shift. Listed below is the number of times each technician instructed the production foreman to shut down the manufacturing process last week. Technician Shutdowns Taylor 4 Hurley 2 Gupta 4 Rousche 3 Huang 2 How many different samples of two technicians are possible from this population? List all possible samples of two observations each and compute the mean of each sample. (Round your answers to 1 decimal place.) Compare the...
Consider a firm that daily rents machinery for the cost of $1000 and employs workers at the cost of $100 for a full day of work.
Consider a firm that daily rents machinery for the cost of $1000 and employs workers at the cost of $100 for a full day of work. The following table describes the production function of the firm. Fill the table such that you can make some production decisions for this firm.Units of LaborUnits of ProductionFixed CostsVariable CostsTotal CostsAverage Variable CostsAverage Total CostsMarginal Cost111.00216.24319.89422.48524.48626.13727.51828.71929.781030.721131.581232.361333.081433.751534.371. What is the average variable cost of production when 10 units of labor are employed?2. What is the...
24 hours a day, there are workers who use 16 hours of leisure (L) and labor...
24 hours a day, there are workers who use 16 hours of leisure (L) and labor (E), excluding 8 hours of sleep. It benefits from the workers' leisure (L) and consumption (C). The utility function of this worker is U(L, C)=L*C. The worker's hourly wage is 10 and the given non-earned income is 10. When both labor and capital income are used for consumption (C), find consumption C that maximizes utility of workers. (However, the price of consumer goods is...
Kaizen Automotive, a Japanese automaker, has a production facility in Ohio that employees over 600 workers....
Kaizen Automotive, a Japanese automaker, has a production facility in Ohio that employees over 600 workers. In December 2013, it announces an executive position has opened at the facility and solicits applications. Among the finalists for the position is June, a Japanese citizen and graduate of MIT with four year's experience in automotive production. Another candidate is John, an African American who is also an MIT graduate and holds an MBA from Harvard. John has over ten year's automotive manufacturing...
A small equipment rental facility has nine appliance dollies. There are 14 customers every day who...
A small equipment rental facility has nine appliance dollies. There are 14 customers every day who request this equipment. If the equipment is not available, they leave and go to a competing rental facility. Customers arrive evenly over a 12-hour period (6am to 6pm), 7 days per week. The average rental duration is 6 hours. a. What is the likelihood that a customer going to the rental facility will find an appliance dolly available? b. Assume each 6-hour rental is...
SOALAN/ QUESTION 2 Toyyib Biz employs 500 production, maintenance and janitorial workers in eight separate departments....
SOALAN/ QUESTION 2 Toyyib Biz employs 500 production, maintenance and janitorial workers in eight separate departments. In addition to supervising operations, the supervisors of departments are responsible, for recruiting, hiring and firing workers within their areas of responsibility. The organization attracts casual labour and experiences a 15 to 25 percent turnover rate in employees per year. Toyyib Biz designs specialised procedures for payroll process, which is separated from general purchasing and disbursement procedures. The payroll procedures for Eximus Company, are...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT