1) What combination of X and Y will yield the optimum for this problem?

Maximize Z = 10x+30y subject to (1) 4x + 6y < 12 and (2) 8x + 4y < 16

A) X=2.0, Y=0.0 B) X=1.5, Y=1.0, C) X=0.0, Y=2.0, D) X=3.0, Y=2.0 E) None

2) What combination of X and Y will provide a minimum for this problem?

Minimize Z = X + 3Y subject to: (1) 2X + 4Y > 12 and (2) 5X + 2Y > 10

A) X=6.0, Y=0.0 B) X=5.0, Y=0.0, C) X=1.0, Y=2.5, D) X=2.5, Y=1.0 E) None

Please show work

Solutions

Expert Solution


Related Solutions

Please show all work Yield to maturity. (a) Find the yield to maturity on a 1-month...
Please show all work Yield to maturity. (a) Find the yield to maturity on a 1-month T-bill with $100,000 face value that sold for a price of $99,667.77. Answer: i = 0.04 (b) Consider a loan of $400,000 to be repaid with annual payments over 25 years. Find the fixed payments that would be required for the yield to maturity on the loan to be 6%. Answer: FP = $31,290.68. (c) Consider a loan of $200,000 to be repaid with...
please show the work for computing the atea bounded by curves of y=11.2arctanx y=12.6 x=0
please show the work for computing the atea bounded by curves of y=11.2arctanx y=12.6 x=0
Sketch the curve of the following function and show all the work y=x/√(x²-1)
Sketch the curve of the following function and show all the work y=x/√(x²-1)
1. Use the following data to answer the questions below. Show your work (x-mx^2 x y...
1. Use the following data to answer the questions below. Show your work (x-mx^2 x y (y-my)^2 (x-m)(y-m) 9 8 9 16 12 9 2 5 0 0 16 1 5 0 0 9 2 8 9 -9 16 9 2 9 -12 9 8 1 16 -12 Sum 68 5 5 Sum 50 Sum -21 x y 8 9 2 5 1 5 2 8 9 2 8 1 What is the covariance between Y and X What is...
Please show all work. Suppose the U.S. yield curve is flat at 6% and the euro...
Please show all work. Suppose the U.S. yield curve is flat at 6% and the euro yield curve is flat at 4%. The current exchange rate is $1.3 per euro. What will be the swap rate on an agreement to exchange currency over a 3-year period? The swap will call for the exchange of 2.7 million euros for a given number of dollars in each year.
f(x,y)=30(1-y)^2*x*e^(-x/y). x>0. 0<y<1. a). show that f(y) the marginal density function of Y is a Beta...
f(x,y)=30(1-y)^2*x*e^(-x/y). x>0. 0<y<1. a). show that f(y) the marginal density function of Y is a Beta random variable with parameters alfa=3 and Beta=3. b). show that f(x|y) the conditional density function of X given Y=y is a Gamma random variable with parameters alfa=2 and beta=y. c). set up how would you find P(1<X<3|Y=.5). you do not have to do any calculations
1. In the utility function U(x,y)=x^5y^2 does Y exhibit diminishing marginal rate of substitution? Please show...
1. In the utility function U(x,y)=x^5y^2 does Y exhibit diminishing marginal rate of substitution? Please show your work. 2.What is the no-waste condition for the utility function U(x,y)=min{x/3,y/5} express your answer in terms of y as a function of x 3. What is the MRS of the utility function U(x,y)=3x+1/2y? please show your work
Show that if Y is a subspace of X, and A is a subset of Y,...
Show that if Y is a subspace of X, and A is a subset of Y, then the subspace topology on A as a subspace of Y is the same as the subspace topology on A as a subspace of X.
1. Calculate the current yield (show work)? 2. What is the "dirty price" when adding accrued...
1. Calculate the current yield (show work)? 2. What is the "dirty price" when adding accrued interest to the "clean price"? 3. Assuming 182 days in six month period, 365 days per year estimate YTM using iterative method? 4. Draw Cash flow Diagram Please show work with this homework Price 170 Coupon% 4 Maturity Date 20 Jan 2019 Yield to Maturity% Current Yield % Fitch Ratings: AAA Coupon Payment Frequency Semi-Annual First Coupon Date 20 Jan 2009 Offering Info Quanitiy...
SHOW WORK A firm is considering two mutually exclusive projects, X and Y, with the following...
SHOW WORK A firm is considering two mutually exclusive projects, X and Y, with the following cash flows: 0 1 2 3 4 Project X -$1,000 $100 $280 $400 $650 Project Y -$1,000 $1,100 $110 $50 $55 The projects are equally risky, and their WACC is 11%. What is the MIRR of the project that maximizes shareholder value? Do not round intermediate calculations. Round your answer to two decimal places.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT