“All experienced auditors would design exactly the same audit program for a particular audit engagement.” Do...

“All experienced auditors would design exactly the same audit program for a particular audit engagement.” Do you agree? Explain. Remember to complete all parts of the problems. Do not forget to show the necessary steps and explain how you attained that outcome.

Solutions

Expert Solution

Audit Programme

Audit program is a detailed plan of work prepared by auditor before starting audit. It contain detailed information about various steps and audit procedures to be followed by the audit. It contain nature, timing and extend of audit procedure. Following factors should also be noted.

  • Audit program includes audit procedures
  • Detail information of works to be performed by audit staff.
  • Auditor should prepare audit program considering the nature of business of the client.
  • Audit program should fix the time period to complete job assigned to the assistants.
  • It also contain materiality and risk level
  • Assistant should sign after the completion of his/her job.

Following factors should be considered while preparing audit program

1) Nature of business

2) Materiality of item

3) Level of audit risk

4) Time available

5) Scope of work etc.

Conclusion: - As per the details given above, it is sure that same audit program may not be designed for a particular audit engagement. It may be revised under different circumstances. If an item is material in nature, the auditor has to extend his audit procedure. It provide a basic plan for audit. It may not be exactly same in all circumstanses.


Related Solutions

jenny and Sam are the auditors for the AAA audit firm. They discuss an audit program...
jenny and Sam are the auditors for the AAA audit firm. They discuss an audit program for the sales account. Jenny and Sam disagree about whether they should use procedure (1) or (2) below to test the Occurrence assertion for the sales account: Procedure (1): Select a sample of sales invoices, delivery dockets and customer orders and agree the details to the details recorded in the sales journal. Procedure (2): Select a sample of sales from the sales journal and...
Why do auditors use the audit risk model when planning an audit? If audit evidence was...
Why do auditors use the audit risk model when planning an audit? If audit evidence was gathered and evaluated and an auditor decides to increase the assessed level of control risk from that originally planned what would need to be done in order to achieve an overall audit risk level that is substantially the same as the planned audit risk level? Why would an auditor want to achieve this level?
This program will function exactly the same as Ponder 02. It prompt the user for a...
This program will function exactly the same as Ponder 02. It prompt the user for a filename. We will then read the contents of the file into a list. The program will then prompt the user for a name. Finally, we will tell the user whether the name is in the list. Read From a File The first part of the program will be to read the contents of a file into a list. This data will be in JSON....
What do you understand by the term ‘Audit Risk’ and ‘Audit evidence’? How auditors can reduce...
What do you understand by the term ‘Audit Risk’ and ‘Audit evidence’? How auditors can reduce audit risk with audit evidence, support your answer from annual report of Saudi Aramco 2019
An audit firm must evaluate the client and the engagement according to professional standards. Do you...
An audit firm must evaluate the client and the engagement according to professional standards. Do you feel that the full evaluation must be done on both new and existing clients? Do you think this evaluation is an effective method to assess clients? Explain your answers, using examples.
Design a program which a census the numbers and percentages of houses with particular numbers of...
Design a program which a census the numbers and percentages of houses with particular numbers of occupants in a road. The output must appear in a table like the one below: Output Occupants 0 1 2 3 4 5 6 >6 No. houses 2 3 7 9 6 4 2 2 Percentage 5.7% 8.6% 20.0% 25.7% 17.1% 11.4% 5.7% 5.7% Houses with more than 6 occupants are considered to be overcrowded, and are to be output under a single column...
Design a Matlab program for the Brayton Cycle. The program would be for a standard air...
Design a Matlab program for the Brayton Cycle. The program would be for a standard air cycle. The program should show specific work and thermodynamic efficiency from r=1 to 50, t=1 to 5 , where r is the pressure ratio and t is the temperature ratio,
You have been asked to design a resistance training program for an experienced weight lifter who...
You have been asked to design a resistance training program for an experienced weight lifter who is training for maximal power. Briefly explain the importance of repetition velocity in power development
In git, the term "branch" and the term "commit" mean exactly the same thing (i.e. all...
In git, the term "branch" and the term "commit" mean exactly the same thing (i.e. all branches are commits, and all commits are branches)?
Create comprehensive audit programs for the Sales and Receivables So each audit program would include the...
Create comprehensive audit programs for the Sales and Receivables So each audit program would include the following components: Audit steps for tests of controls, balances, transactions, analytical procedures, etc. as well as other considerations such as sample size and sample methodology.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT