Question

In: Civil Engineering

A freeway is being designed for a location in mountainous terrain. The expected free-flow speed is...

A freeway is being designed for a location in mountainous terrain. The expected free-flow speed is 88.5 km/h. Lane widths will be 3.6 m and shoulder widths will be 1.8 m. During the peak hour, it is expected there will be a directional peak- hour volume of 2700 vehicles, 12% large tracks and buses and 6% recreational vehicles. The PHF and driver population adjustment are expected to be 0.88 and 0.90, respectively. If a level of service no worse than D is desired, determine the necessary number of lanes.

Solutions

Expert Solution


Related Solutions

A long segment of the suburban freeway is to be designed on level terrain. The level...
A long segment of the suburban freeway is to be designed on level terrain. The level segment, however, is followed by a 4.5% grade, 2.0 miles in length. If the DDHV is 2,500 veh/h with 15% trucks (standard mix), how many lanes will be needed on the (a) upgrade, (b) downgrade, (c) level terrain segment to provide for the level of service C? Lane widths and lateral clearances may be assumed to be 12 ft and 6 ft, respectively. Ramp...
Assume the speed and density at a freeway location follows a linear relationship.You observe traffic flow...
Assume the speed and density at a freeway location follows a linear relationship.You observe traffic flow rate of 2250 vehicles/hour at 45 mph and 3000 vehicles/hour at 30 mph. What are the jam density, free flow speed (max speed), and capacity of this freeway location? How about the density and speed (i.e., the critical density and the critical speed) at the capacity?
A six lane urban freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes...
A six lane urban freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes and obstructions 5 ft from the right edge. For every mile of freeway, there is one interchange. The traffic stream consists of mostly commuters with a peak hour factor of 0.84, peak hour volume of 2500 vehicles, and 4% recreational vehicles. What is the LOS? Assume base free flow speed of 70 mph
Transportation: Which is more significant in reducing free flow speed on a freeway, narrower lanes or...
Transportation: Which is more significant in reducing free flow speed on a freeway, narrower lanes or a narrower right side shoulder? Does this make sense to you? Why?
Traffic on a three-lane freeway observes a triangular flow-density relationship with free-flow speed vf=100km/h, capacity c=2000veh/h/lane,...
Traffic on a three-lane freeway observes a triangular flow-density relationship with free-flow speed vf=100km/h, capacity c=2000veh/h/lane, jam density kj=150veh/km/lane. Flow in the freeway from upstream is 5000veh/h, while the ramp flow is negligible (almost zero).At 9:45am, an accident occurs at point A. The vehicles involved close one lane of traffic (total capacity reduces to 4000veh/h) for 15min and afterwards the scene is clear (capacity returns to 6000veh/h). Lucy enters the freeway via the ramp at point B at 10:00am. Distance...
A new suburban freeway is being designed. Estimated AADT is 40,000 veh/day, 60% of the peak...
A new suburban freeway is being designed. Estimated AADT is 40,000 veh/day, 60% of the peak flow traffic travels in the peak direction, the PHF is 0.85, and the terrain is rolling. There will be 3 ramps per mile, and traffic is expected to include 18% heavy vehicles (50% SUTs and 50% TTs). Lanes will be 12 feet wide with a lateral clearance of 6 feet. One segment of the road of the road has a 0.75-mile-long section with a...
A company's most recent annual Free Cash Flow is $180,000,000. Free cash flow is expected to...
A company's most recent annual Free Cash Flow is $180,000,000. Free cash flow is expected to grow by 15% per year for the next 10 years and then grow by 3% per year thereafter. Investors required rate of return is 11%. What is the current value of the stock? a. $11,300,755,080 b. $2,250,000,000 c. $5,404,011,121 d. $1,636,363,636
A highway being designed to AASHTO guidelines with a 70 mph design speed, and at one...
A highway being designed to AASHTO guidelines with a 70 mph design speed, and at one section, an equal tangent vertical curve must be designed to connect grades of +1% and -2%. If the grades intersect at station 100+00, determine the stationing of the PVC, PVT and curve high point for the minimum curve length based pn SSD requirements.
A CSTR activated sludge system is being designed for the Fulton Fish Processing Plant. The flow...
A CSTR activated sludge system is being designed for the Fulton Fish Processing Plant. The flow is relatively small (0.25 mgd), but the wastewater is strong due to all of the fish waste (BOD5 = 4500 mg/L). Primary settling removes 20% of the BOD5. In order to discharge to the town sewer the BOD5 must be reduced to a concentration that is 95% of the influent. What is the Dimensions of the basin assuming a 3:1 L:W ratio. Also, what...
A firm with no debt and no preferred stock is expected to have free cash flow...
A firm with no debt and no preferred stock is expected to have free cash flow of $46 million each year indefinitely. If investors require a 9% return on their equity, what is the value of the firm's equity?
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT