Question

In: Civil Engineering

As a Project Engineer in consultant firm, you are assigned to design a residential building with...

As a Project Engineer in consultant firm, you are assigned to design a residential building with basement at Yuen Long. How would you describe to the developer your findings from site investigation?

Solutions

Expert Solution

As a Project Engineer, I would make a detailed report of the site investigation and submit it to the developer which would consist of the following key points:-

  • DESCRIPTION OF STRUCTURE

This point would contain the type of building, details of columns, details of loads, calculated central column load for foundation calculations.

  • FIELD SAMPLING

This point would contain the bore hole data, their locations, type of test say SPT, The depth/interval at which samples are collected.

  • LABORATORY TESTS

This point would contain the laboratory tests carried out in order to evaluate soil parameters such as--Type of soil and it's gradation properties, Specific Gravity,Natural Moisture Content (NMC) ,Sieve analysis on the coarse grained soil fraction.

  • SOIL PROFILE

The arrived soil profile is mentioned in this point based on visual identification of soil samples and test results.The soil profile details are presented in the bore-chart.

  • GROUND WATER TABLE

The ground water table depth at the time of soil investigation encountered is mentioned here.

  • DETAILS OF FOUNDATION

From the sub soil profile and laboratory test data, the foundation to be used is selected.

  • RECOMMENDATIONS

This point contains recommendations such as excavation depth, type of footing, thickness of footings, grade of concrete, type of dewatering technique to be used.

  • SAFE BEARING CAPACITY CALCULATIONS

These calculations are done based on the assumed loads of the foundations. They can be modified as per structural analysis.

  • TEST RESULTS AND GRAPHS

This would contain all the supporting laboratory and field test result sheets and graphs which support the soil investigation and recommended values.


Related Solutions

(Q2) As a fire engineer, assume that you are assigned to a fire engineering design of...
(Q2) As a fire engineer, assume that you are assigned to a fire engineering design of the retail building with extraordinary atrium that connected six floors. You have to adopt fire engineering approach on this project and conduct a theoretical analysis of full evacuation in this commercial building. Please brief your design procedures. (Hint: Relationship between occupant density, travel speed and flow is recommended to consider.)
As an engineer working for CableComm you are assigned to work on a project that involves...
As an engineer working for CableComm you are assigned to work on a project that involves moving 90 people to the 10th floor of a building (Schuylkill View) in Philadelphia. This space is overflow from another building in Philadelphia (CableComm1) that is completely full. The 10th floor will be on its own network segment. All 90 people will have desktop computers and IP phones. A DHCP server will be installed on the 10th floor. A network engineer provides you the...
Heat Transfer Problem You had been assigned, at General Motors as a design engineer, to design...
Heat Transfer Problem You had been assigned, at General Motors as a design engineer, to design a radiator (Heat Exchanger) for a new model car . It is necessary that the heat exchanger will be compact enough to fit within a space of 2 feet by 3 feet available in front of the car. IF the temperature of the incoming engine coolant is 150 degree Centigrade and the outside temperature of air is about 38 C: What type of heat...
As a Geologist in consultant firm, you are assigned to work at the ground investigation site...
As a Geologist in consultant firm, you are assigned to work at the ground investigation site for a residential development project in the New Territories East adjoining Tolo Channel (i.e. Ma On Shan). How would you describe to the developer your findings of the major rock and mineral group?
On February 8, 2018, Holly purchased a residential apartment building. The cost basis assigned to the...
On February 8, 2018, Holly purchased a residential apartment building. The cost basis assigned to the building is $209,000. Holly also owns another residential apartment building that she purchased on December 15, 2018, with a cost basis of $588,000. Click here to access the depreciation tables. If required, round intermediate calculations and final answers to nearest dollar. a. Calculate Holly's total depreciation deduction for the apartments for 2018 using MACRS. $ b. Calculate Holly's total depreciation deduction for the apartments...
Prepare a duty list for a consultant assistant engineer of a civil engineering project (construction of...
Prepare a duty list for a consultant assistant engineer of a civil engineering project (construction of a pedestrian bridge).
You are the lead human–computer interaction (HCI) engineer on a major design project for an organization...
You are the lead human–computer interaction (HCI) engineer on a major design project for an organization of your choice. Employees or customers will use this new system and user interface (UI) design to perform data entry for the organization. The UI will need to provide the required input and output to characterize the type of data collected by the organization. Choose an organization, such as a business, nonprofit group, government, or another organization. Provide a description of your chosen organization,...
1. Tom is a civil engineer and working in a large construction project. Tom was assigned...
1. Tom is a civil engineer and working in a large construction project. Tom was assigned by his manager to look for steel suppliers for the project. Tom placed a newspaper advertisement for potential suppliers to bid. A potential supplier approached Tom, indirectly requested Tom to buy steel from his company. Then he invited Tom to an expensive dinner and a boat tour. Tom was planning to accept the dinner invitation and boat tour. (a) Identify the ethical situation in...
A property management firm is planning to acquire a residential building with multiple rooms and use...
A property management firm is planning to acquire a residential building with multiple rooms and use it as a motel. The building monthly costs were estimated as follow: Building rent with utilities $17,000 Building insurance $500 Food supplies per room $150 Room service per room $250 Receptionist salary $2500 If the room monthly rent is $2400, perform breakeven analysis as follow: a. Develop cost, revenue and profit models for this problem. b. Using analytical method, find how many rooms should...
A construction company is evaluating an investment project consisting in developing a new residential building on...
A construction company is evaluating an investment project consisting in developing a new residential building on a plot of land. The cost of the land, to be paid in t=0, is €500K and construction would take 2 years. Construction costs are estimated to be €650K in t=1 and €650K in t=2. The building would then generate an annual cash flow of €250K in perpetuity, starting from t=3. If the cost of capital is 8%, the NPV of this project is...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT