Question

In: Civil Engineering

The city of Stay at Home counted 150,000 people in the 1970s, when its wastewater treatment...

The city of Stay at Home counted 150,000 people in the 1970s, when its wastewater treatment plant was built. Because of a recent economic boom, the city has been growing at a fast rate and new developments will bring the total population to 350,000 people within 10 years from now. There is no more footprint available to expand the existing plant, which is land locked in the middle of an industrial zone. The city council, therefore, decided to build a new plant on the other side of the town. This new plant will be designed to treat the wastewater from the additional 200,000 people. You are the designer. Analysis of the last 5 years of operating data shows that the old plant received an average volume of 15 million gallon per day (MGD) with an average BOD5 concentration of 250 mgBOD5/L and an average TSS concentration of 270 mgTSS/L. This average BOD5 and TSS data will be used as the reference to calculate the wastewater concentration and mass expected to be supplied to the new system. We know that the new houses and buildings that will be connected to the new plant will be much more water efficient (through a mandate for the new homes to use high efficiency water fixture and a mandate for the new buildings to treat and recycle wastewater onsite). It is, therefore, expected that customers connected to the new wastewater treatment plant will use half the volume of water used by customers connected to the old system. In order to estimate the new plant BOD5 and TSS mass loading, you assumed that, although people connected the new system will use half the amount of water, the mass of waste contributed by each person connected to both the old and new plants will be the same.

3. What is the BOD5 mass loading to the old plant? (answer will be given in the unit of lbBOD5/day)

4. What is the TSS mass loading to the old plant? (answer will be given in the unit of lbBOD5/day)

5. What are the average BOD5 and TSS mass loading per person to the old plant? In other words, in average, how much does each individual person contributes to the old plant BOD5 and TSS mass loading? (answers will be given in the unit of lb/person*day)

6. Based on the assumptions from the design team, what will the BOD5 and TSS mass loading to the new plant be? Remember that the mass of waste contributed by each person connected to both the old and new plants will be the same but that there will be more people connected to the new system.

7-What are the expected average BOD5 and TSS concentrations of the wastewater entering the new plant? (answer will be given in the unit of mg/l). Remember that the people connected to the new plant will use half the volume of

Solutions

Expert Solution


Related Solutions

The city of Stay at Home counted 150,000 people in the 1970s, when its wastewater treatment...
The city of Stay at Home counted 150,000 people in the 1970s, when its wastewater treatment plant was built. Because of a recent economic boom, the city has been growing at a fast rate and new developments will bring the total population to 350,000 people within 10 years from now. There is no more footprint available to expand the existing plant, which is land locked in the middle of an industrial zone. The city council, therefore, decided to build a...
A city wants to build and operate a wastewater treatment facility over a very long service...
A city wants to build and operate a wastewater treatment facility over a very long service life as “perpetual” infrastructure for the city. A consulting engineer has estimated that the plant will cost $40 million to construct. She further estimates it will require $12 million every 20 years to replace major unit operations equipment (bar screens, aeration equipment, dewatering centrifuges, etc.) and $21 million every 40 years for major renovation of tanks and other structural elements. Operations and maintenance costs...
During a chemical treatment of wastewater the reaction rate found to be 20.8 /minutes when the...
During a chemical treatment of wastewater the reaction rate found to be 20.8 /minutes when the temperature of wastewater was 29.4°C. What will be the reaction rate when the same reaction is performed in the evening when temperature reduced to Y °C. The value of temperature coefficient is 1.130 NaOH + FeCl3 >    Fe(OH)3 + NaCl
A wastewater treatment plant, which serves a population of 300,000 people, receives an average daily volume...
A wastewater treatment plant, which serves a population of 300,000 people, receives an average daily volume of 24 million gallons per day (MGD) at an average influent 5-day biochemical oxygen demand concentration of 200 mgBOD5/L and an average influent total suspended solids concentration of 220 mgTSS/L. The plant operates a primary sedimentation process that remove 65% of the incoming TSS and 35% of the incoming BOD5%. This process is followed by a secondary treatment process before discharge to the local...
After the acknowledgement of the Coronavirus pandemic and the stay-at-home orders, people began to buy food...
After the acknowledgement of the Coronavirus pandemic and the stay-at-home orders, people began to buy food and other supplies in large amounts, and hoarded them. To this day paper products and hand sanitizers are still not easily available. However, the initial hoarding seems to have stopped for most products. Another even of interest is that in recent weeks due to high infection rates among the workers of meat packing companies, some have closed their doors temporarily, and pig farmers cannot...
2)When we dispose the wastewater to the environment without treatment it will cause many problems Discuss...
2)When we dispose the wastewater to the environment without treatment it will cause many problems Discuss this issue 3)Discuss the role of the microbes in wastewater treatment plant 4) the microorganisms have many benefits and risks for the soil. Discuss these benefits and risks ? 5) How the soil characteristics can affect the microbe’s activities ?
Cassatt Industries is facing a dilemma. During the COVID 19 "Stay at Home" period, many people...
Cassatt Industries is facing a dilemma. During the COVID 19 "Stay at Home" period, many people developed new hobbies. The demand for paint sets increased dramatically. Due to supply chain interruptions, the cost materials to make those paint sets also increased. Cassatt Industries manufactures only two products, Water-Color Paint Sets and Oil-Based Paint Sets. To generate adequate profit and cover its expenses throughout the value chain, Cassatt prices its paint sets at 400% of manufacturing cost. The company is concerned...
A wastewater treatment plant serves 5,000,000 people. Each person on the average produces 0.1m^3 per person...
A wastewater treatment plant serves 5,000,000 people. Each person on the average produces 0.1m^3 per person per day of wastewater. If the ultimate BOD of the discharge from the plant is 50 mg/L into a 5-meter deep stream that has an average flow rate of 10m^3 per second, a velocity of 1 meter per second, and a BOD value of 5 mg/L. The deoxygenation constant Kd is 0.19/day, and DO at the mix point is 8.5 mg/L. The water temperature...
Wastewater Engineering: Find out which water treatment plant serves your home, draw a diagram including each...
Wastewater Engineering: Find out which water treatment plant serves your home, draw a diagram including each of the main components of the process. Describe the objective of each of the individual components.
Inflation rate during the 1970s was much higher than most people had expected when the decade...
Inflation rate during the 1970s was much higher than most people had expected when the decade began. Use the concept of real interest rate and explain: a) How did this unexpectedly high inflation affect homeowners who obtained fixed-rate mortgages during the 1960s? b) How did it affect the banks that lend the money during the 1960s?