Question

In: Civil Engineering

For a moist soil sample the following are given: Total volume = 1.15 m3 Total mass...

For a moist soil sample the following are given: Total volume = 1.15 m3 Total mass = 2300 kg Moisture content = 7.4 % Gs = 2.69 Determine the following: 1. Moist unit weight (γwet) 2. Dry unit weight (γd) 3. Void ratio (e) and Porosity (n) 4. Degree of saturation (Sr) 5. Volume of water in the soil sample

Solutions

Expert Solution


Related Solutions

A sample of moist soil having a wet mass of 1.0 kg and a volume of...
A sample of moist soil having a wet mass of 1.0 kg and a volume of 0.64 liter (6.4 ´ 10-4 m3) was dried in the oven and found to have a dry mass of 0.8 kg. Assuming a typical value of particle density of 2650 kg/m3, calculate the bulk density rb, porosity f, mass water content qg, volumetric water content qv, and air-filled porosity fa.
The weight of a chunk of moist soil sample is 77.6 lb. The volume of the...
The weight of a chunk of moist soil sample is 77.6 lb. The volume of the soil chunk measured before drying is 0.40 ft3. After the sample is dried out in an oven, its weight is 68.8 lb. The specific gravity of solids is 2.55. Find the: Water content. Unit weight of moist soil. Void ratio. Porosity. Degree of saturation
Phase Diagram: A sample of moist soil was found to have the following characteristics: Volume: 0.60...
Phase Diagram: A sample of moist soil was found to have the following characteristics: Volume: 0.60 Ft3 (as sampled) Mass: 60 Lb (as sampled) Mass: 50 Lb (after oven drying) Specific Gravity: 2.65 First Question: Find a-h? (show your work) Ratio Porosity Degree of Saturation Wet density (total density) Dry density Volume of Solid Volume of Void Weight of air
For a given soil, the following are given: Gs = 2.67; moist unit weight is 17.61...
For a given soil, the following are given: Gs = 2.67; moist unit weight is 17.61 kN/m3, and moisture content = 10.8%. Determine the weight of water, in KN, to be added per cubic meter : 100& degree of saturation (kN/m3)
a) The soil from a borrow pit is at a total density of 1.8 t/m3 and...
a) The soil from a borrow pit is at a total density of 1.8 t/m3 and a water content of 12%. It is desired to construct a road subgrade with a compacted total density of 2 t/m3 at a water content of 17%. Determine the quantity of soil (dry mass in tonnes) to be excavated from the barrow pit and the amount of water (in litres) to be added for every 1 m3 of compacted soil in the embankment. (Assume...
For a sample of 12 trees, the volume of lumber (in m3) and the diameter (...
For a sample of 12 trees, the volume of lumber (in m3) and the diameter ( in cm ) at a fixed height above the ground level was measured. The results were as follows. Use Excel sheet Diameter Volumes 35.1 0.81 48.4 1.39 47.9 1.31 35.3 0.67 47.3 1.46 26.4 0.47 33.8 0.8 45.3 1.69 25.2 0.3 28.5 0.19 30.1 0.63 30 0.64 a)Construct a scatterplot of volume ( y ) versus diameter ( x ). using Excel b)Compute the...
Mass of dry soil in a metal sampling ring = 77g Volume of sampling ring =...
Mass of dry soil in a metal sampling ring = 77g Volume of sampling ring = 59cm3 Question 1: What is the Soil Bulk Density? Given A contaminant is present on a 1 hectare area down to 10 cm Question 2: Using the bulk density calculated above, figure the dry weight of soil present over the contaminated area Given It rains before you are able to excavate the contaminated soil. The volumetric water content is measured to be 0.2 (20%)...
A piston-cylinder assembly has initially a volume of 0.3 m3 of air at 25 oC. Mass...
A piston-cylinder assembly has initially a volume of 0.3 m3 of air at 25 oC. Mass of the air is 1 kg. Weights are put on the piston until the air reaches to 0.1 m3 and 1,000 oC, in which the air undergoes a polytropic process (PVn = const). Assume that heat loss from the cylinder, friction of piston, kinetic and potential effects are negligible. 1) Determine the polytropic constant n. 2) Determine the work transfer in kJ for this...
Given the following: Bucket volume of loader: 3.6 L m3 (loose cubic meters) Loader cycle: 0.42...
Given the following: Bucket volume of loader: 3.6 L m3 (loose cubic meters) Loader cycle: 0.42 min Truck capacity: 11.5 L m3 Truck traveling time with load 2.28 min Truck maneuvering for tipping and tipping time 0.65 min Truck return time 1.18 min Truck maneuvering for loading 0.40 min Planned activities (lunch, breaks etc…) 0.64 min Waiting time at loader (per cycle) 0.50 min Conversation with supervisor (per cycle) 0.25 min Other cycle time affecting machine performance 0.75 min Swell...
What is the gravimetric water content, of a soil sample having a wet mass of 1.63...
What is the gravimetric water content, of a soil sample having a wet mass of 1.63 kg and a dry mass of 1.33 kg? And then answer, what is the volumetric water content of this sample if its dimensions are known to be 0.1m x 0.1m x 0.1m? Please show workings and explain each step.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT